Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14346
Well Classification: GW Status: SI - 10/1/2020
Well Name/No:HSR-TUCK #10-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2020
FacilityID:246549LocationID:327226
County:WELD #123Location:NWSE 24 3N66W 6
Field:WATTENBERG - #90750Elevation:5031 ft.
Planned Location:1980FSL  1980 FELLat/Long: 40.208987 / -104.722878Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.209103 / -104.723442Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2020             Measured TD: 8065 ft.    Vertical TD: 8064 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2020
Wellbore PermitDRIFTED
Permit #:20041712 Expiration Date:8/5/2005
Proposed Depth/Form:8039 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SE
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:N/A
Spud Date:8/11/1989Spud Date Is:ACTUAL
Measured TD:8065 ft.Measured PB depth:8064 ft.
True Vertical TD:8064 ft.True Vertical PB depth:8063 ft.
Log Types:DIL/SFL/GR; CBL; DEN/CNL/GR
Log Types:CBL, SONIC, DIL, GR, CND, AIL, CNLD
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 689 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 689 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7599 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 6538 ft., Bottom: 7599 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7518 ft., Depth: 8065 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 21, Top: 7518 ft., Bottom: 8065 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 4076 ft., Depth: 5046 ft., Bottom: 5062 ft., Sacks: 440, Method: 1 INCH
Additional Cement:String Type: 1ST , Top: 472 ft., Depth: 1560 ft., Bottom: 1569 ft., Sacks: 535, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
SUSSEX4634 ft.NN
NIOBRARA7184 ft.NN
FORT HAYS7425 ft.NN
CODELL7446 ft.NN
GREENHORN7530 ft.NN
J SAND7904 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 10/1/2020                 Interval Top: 7912 ft.    Interval Bottom: 7966 ft.

 Completed Information for Formation J SAND
1st Production Date:12/1/2004Choke Size: 
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/12/2004
Treatment Summary:JSND 148,511 GAL FLUID; 4,000# 12/20 SAND; 115,000# 30/50 SAND. NO TEST.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7912 ft.# Of Holes:108
Interval Bottom:7966 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/10/2004                 Interval Top: 7449 ft.    Interval Bottom: 7463 ft.

 Completed Information for Formation CODELL
1st Production Date:3/23/1990Choke Size: 
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/12/2004
Treatment Summary:FRAC'D W/24,000# 100 MESH SAND; 263,000# 20/40 MESH SAND; 69,150 GALS GELLED FLUID, 1990. // FRAC'D W/ 240,576 GALS GELLED FLUID; 261,240# 20/40 BRIGHTON-UNIMIN-OTTAWA, 2004.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/25/1990Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 22
CALC_BBLS_H2O 0
CALC_BBLS_OIL 22
CALC_GOR 5864
CALC_MCF_GAS 129
CASING_PRESS 1675
MCF_GAS 129
TUBING_PRESS 1075
Perforation Data:
Interval Top:7449 ft.# Of Holes:28
Interval Bottom:7463 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 12/1/2004                 Interval Top: 7186 ft.    Interval Bottom: 7966 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/12/2004
Treatment Summary:SEE INDIVIDUAL FORMATIONS. COMMINGLED J SAND, NBRR, & CODL.
Tubing Size:2.375 in.Tubing Setting Depth:7890 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 3
CALC_BBLS_H2O 0
CALC_BBLS_OIL 3
CALC_GOR 25333
CALC_MCF_GAS 76
CASING_PRESS 601
GRAVITY_OIL 55.7
MCF_GAS 76
TUBING_PRESS 273
Perforation Data:
Interval Top:7186 ft.# Of Holes:188
Interval Bottom:7966 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 10/1/2020                 Interval Top: 7186 ft.    Interval Bottom: 7463 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/29/1991Choke Size:0.187 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/12/2004
Treatment Summary:SEE INDIVIDUAL FORMATIONS.
Tubing Size:2.375 in.Tubing Setting Depth:7419 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/2/1991Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 5
CALC_BBLS_H2O 0
CALC_BBLS_OIL 5
CALC_GOR 14200
CALC_MCF_GAS 71
CASING_PRESS 900
GRAVITY_OIL 60
MCF_GAS 71
TUBING_PRESS 500
Perforation Data:
Interval Top:7186 ft.# Of Holes:41
Interval Bottom:7463 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/1/2004                 Interval Top: 7186 ft.    Interval Bottom: 7328 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/20/1991Choke Size:0.187 in.
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/12/2004
Treatment Summary:FRAC'D W/106,000# 20/40 MESH SAND + 43,100 GAL GELLED FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/23/1991Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 15
CALC_BBLS_H2O 0
CALC_BBLS_OIL 15
CALC_GOR 6600
CALC_MCF_GAS 99
CASING_PRESS 1200
GRAVITY_OIL 60
MCF_GAS 99
TUBING_PRESS 900
Perforation Data:
Interval Top:7186 ft.# Of Holes:13
Interval Bottom:7328 ft.Hole Size:0.38 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
09/30/2020
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No