|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/26/2018 Measured TD: 8130 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/26/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 19890204 | Expiration Date: | 1/16/1993 | | Proposed Depth/Form: | 8165 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/21/2004 | | Spud Date: | 4/7/1989 | Spud Date Is: | ACTUAL | | Measured TD: | 8130 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SFL, CFDL, & CB/GR | | Log Types: | I-SFL, CFDL & CB/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 536 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 536 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8116 ft., Weight: 15.5/17 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 6450 ft., Bottom: 8116 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6008 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 5360 ft., Bottom: 6110 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4408 ft. | | N | N | | NIOBRARA | 7333 ft. | | N | N | | CODELL | 7526 ft. | | N | N | | J SAND | 7966 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/26/2018 Interval Top: 7968 ft. Interval Bottom: 8008 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/5/1989 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/21/2004 | | Treatment Summary: | 40,000# 100 MESH, 715,000 20/40, BLWTBR-6168 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/8/1989 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 62 | | BBLS_OIL | 3 | | CALC_GOR | 153000 | | MCF_GAS | 459 |
| | Perforation Data: | | Interval Top: | 7968 ft. | # Of Holes: | 66 | | Interval Bottom: | 8008 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/21/2004 Interval Top: 7384 ft. Interval Bottom: 8008 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 7/3/1993 | Choke Size: | 0.187 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/21/2004 | | Treatment Summary: | REFRAC 6/03: 34,650 GALS VISTAR 26# GEL 6/13, THEN 130,914 GALS VISTAR 26/27/28# GEL & 242,360# 20/40 OTTAWA SAND 6/25, THEN SQUEEZE NBRR W/ 8 BAGS MAGMA FIBER 6/20. 5/04: REMOVE RBP AND COMMINGLE J SAND WITH THE NIOBRARA AND CODELL. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7962 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/21/2004 | Test Method: | FLOWING | | Hours Tested: | 4 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 5 | | BTU_GAS | 1113 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 18400 | | CALC_MCF_GAS | 92 | | CASING_PRESS | 575 | | GRAVITY_OIL | 48.8 | | MCF_GAS | 92 | | TUBING_PRESS | 440 |
| | Perforation Data: | | Interval Top: | 7384 ft. | # Of Holes: | 159 | | Interval Bottom: | 8008 ft. | Hole Size: | 0.43 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/26/2018 Interval Top: 7384 ft. Interval Bottom: 7542 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/22/1993 | Choke Size: | 0.187 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/21/2004 | | Treatment Summary: | 100,340 GALS YF540 W/ 301,000# 20/40 SAND |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7943 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/27/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 20 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 4500 | | CALC_MCF_GAS | 90 | | CASING_PRESS | 600 | | MCF_GAS | 90 |
| | Perforation Data: | | Interval Top: | 7384 ft. | # Of Holes: | 13 | | Interval Bottom: | 7542 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/26/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|