|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/2/2022 Measured TD: 7975 ft. Vertical TD: 7975 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/2/2022 | Wellbore Permit | DRIFTED | Permit #: | 19881090 | Expiration Date: | 3/1/1989 | Proposed Depth/Form: | 7975 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 11/2/1988 | Spud Date Is: | ACTUAL | Measured TD: | 7975 ft. | Measured PB depth: | | True Vertical TD: | 7975 ft. | True Vertical PB depth: | 7975 ft. | Top PZ Location: | Sec:20 Twp: 3N 66W | Footage: 1317 FSL 1331 FEL | Bottom Hole Location: | Sec:20 Twp: 3N 66W | Footage: 1317 FSL 1331 FEL | Log Types: | FORMATION DENSITY, DUAL INDUCTION | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 624 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 675, Top: 0 ft., Bottom: 624 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 600 ft., Depth: 7975 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 5790 ft., Bottom: 7975 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4654 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 4172 ft., Bottom: 4654 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1640 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 698 ft., Bottom: 1675 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7130 ft. | | N | N | FORT HAYS | 7419 ft. | | N | N | CODELL | 7441 ft. | | N | N | BENTONITE | 7718 ft. | | N | N | J SAND | 7868 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/2/2022 Interval Top: 7887 ft. Interval Bottom: 7936 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/20/1988 | Treatment Summary: | 300,000# 20/40 SD & 500 GAL 7.5% HCL (60,000 GAL GELLED) |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 1.8 | CASING_PRESS | 350 |
| Perforation Data: | Interval Top: | 7887 ft. | # Of Holes: | 78 | Interval Bottom: | 7936 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
Reported Plugged | Y | 05/02/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|