|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/14/2020 Measured TD: 7585 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/14/2020 | Wellbore Permit | DRIFTED | Permit #: | 19880936 | Expiration Date: | 1/16/1989 | Proposed Depth/Form: | 7540 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: E2SE |
| | |
Wellbore Completed | Completion Date: | 10/25/1988 | Spud Date: | 10/2/1988 | Spud Date Is: | ACTUAL | Measured TD: | 7585 ft. | Measured PB depth: | 7497 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CEMENT BOND LOG | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 622 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 0 ft., Bottom: 622 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7523 ft., Weight: 9.3 , Citings Type: ACTUAL | Cement: | Sacks: 210, Top: 6800 ft., Bottom: 7523 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2870 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 2465 ft., Bottom: 2870 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7127 ft. | | N | N | CODELL | 7461 ft. | | N | N |
Formation CODL Formation Classification: GW Status: AB - 1/14/2020 Interval Top: 7461 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/25/1988 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 13 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 52 | CALC_GOR | 2385 | CALC_MCF_GAS | 124 | CASING_PRESS | 2200 | GRAVITY_OIL | 55 | MCF_GAS | 31 | TUBING_PRESS | 2000 |
| Perforation Data: | Interval Top: | | # Of Holes: | | Interval Bottom: | | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: AB - 1/14/2020 Interval Top: 7184 ft. Interval Bottom: 7475 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/21/2006 | Choke Size: | 0.000 in. | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/19/2006 | Treatment Summary: | FRAC'D W/ 4,024 BBLS FRAC FLUID & 238,000# OTTAWA 30/50 SAND & 12,000# SB EXCEL 12/20 SAND. |
| Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7058 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/26/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 19 | BTU_GAS | 1258 | CALC_GOR | 3579 | CASING_PRESS | 350 | GRAVITY_OIL | 52 | MCF_GAS | 68 | TUBING_PRESS | 300 |
| Perforation Data: | Interval Top: | 7184 ft. | # Of Holes: | 240 | Interval Bottom: | 7475 ft. | Hole Size: | 0.27 in. |
|
|
|
|
|
Reported Plugged | Y | 01/14/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|