Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14075
Well Classification: GW Status: PA - 1/14/2020
Well Name/No:MILLER #44-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/14/2020
FacilityID:246278LocationID:336534
County:WELD #123Location:SESE 20 3N66W 6
Field:WATTENBERG - #90750Elevation:4975 ft.
Planned Location:640FSL  490 FELLat/Long: 40.204867 / -104.793231Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.204722 / -104.793333Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/14/2020             Measured TD: 7585 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/14/2020
Wellbore PermitDRIFTED
Permit #:19880936 Expiration Date:1/16/1989
Proposed Depth/Form:7540 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: E2SE

Wellbore Completed
Completion Date:10/25/1988
Spud Date:10/2/1988Spud Date Is:ACTUAL
Measured TD:7585 ft.Measured PB depth:7497 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CEMENT BOND LOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 622 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 622 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7523 ft., Weight: 9.3 , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 6800 ft., Bottom: 7523 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2870 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 2465 ft., Bottom: 2870 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7127 ft.NN
CODELL7461 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  AB - 1/14/2020                 Interval Top: 7461 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/25/1988
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 13
CALC_BBLS_H2O 0
CALC_BBLS_OIL 52
CALC_GOR 2385
CALC_MCF_GAS 124
CASING_PRESS 2200
GRAVITY_OIL 55
MCF_GAS 31
TUBING_PRESS 2000
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  AB - 1/14/2020                 Interval Top: 7184 ft.    Interval Bottom: 7475 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/21/2006Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/19/2006
Treatment Summary:FRAC'D W/ 4,024 BBLS FRAC FLUID & 238,000# OTTAWA 30/50 SAND & 12,000# SB EXCEL 12/20 SAND.
Tubing Size:2.0625 in.Tubing Setting Depth:7058 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/26/2007Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 19
BTU_GAS 1258
CALC_GOR 3579
CASING_PRESS 350
GRAVITY_OIL 52
MCF_GAS 68
TUBING_PRESS 300
Perforation Data:
Interval Top:7184 ft.# Of Holes:240
Interval Bottom:7475 ft.Hole Size:0.27 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/14/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No