Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-13837
Well Classification: GW Status: PA - 2/15/2022
Well Name/No:HENRY #5-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:67881
Facility Status:PAStatus Date2/15/2022
FacilityID:246040LocationID:326905
County:WELD #123Location:SWNW 5 4N65W 6
Field:WATTENBERG - #90750Elevation:4679 ft.
Planned Location:2062FNL  658 FWLLat/Long: 40.342805 / -104.694179Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.343669 / -104.694830Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/15/2022             Measured TD: 7235 ft.    Vertical TD: 7235 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/15/2022
Wellbore PermitDRIFTED
Permit #:880096 Expiration Date:5/29/1988
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:3/10/1988
Spud Date:2/6/1988Spud Date Is:ACTUAL
Measured TD:7235 ft.Measured PB depth:7197 ft.
True Vertical TD:7235 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 314 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 314 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 314 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7230 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 6400 ft., Bottom: 7230 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7230 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6797 ft.
CODELL7121 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 5/1/2017                  Interval Top: 7121 ft.    Interval Bottom: 7137 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7121 ft.# Of Holes:48
Interval Bottom:7137 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/15/2022                 Interval Top: 6796 ft.    Interval Bottom: 7137 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/16/1988Choke Size:1,264.000 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6796 ft.# Of Holes:266
Interval Bottom:7137 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/6/2006                  Interval Top: 6796 ft.    Interval Bottom: 7010 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/19/2006Choke Size:0.313 in.
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/17/2006
Treatment Summary:FRAC'D WITH 178,449 GALS FRAC FLUID & 238,580# 20/40 SAND & 12,000# 12/20 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7109 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/2006Test Method:
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 34
BBLS_OIL 19
CALC_GOR 28000
CASING_PRESS 400
MCF_GAS 240
TUBING_PRESS 200
Perforation Data:
Interval Top:6796 ft.# Of Holes:218
Interval Bottom:7010 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/15/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No