Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-13771
Well Classification: GW Status: PA - 7/19/2024
Well Name/No:OCOMA #C17-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:68496
Facility Status:PAStatus Date7/19/2024
FacilityID:245975LocationID:326852
County:WELD #123Location:SESE 17 4N64W 6
Field:WATTENBERG - #90750Elevation:4694 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  660 FELLat/Long: 40.306876 / -104.567484Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.306990 / -104.567490Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 7/19/2024             Measured TD: 7081 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 7/19/2024
Wellbore PermitDRIFTED
Permit #:871053 Expiration Date:4/20/1988
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S2SE

Wellbore Completed
Completion Date:1/20/1988
Spud Date:1/16/1988Spud Date Is:Actual
Measured TD:7081 ft.Measured PB depth:7068 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Gamma Ray, CCL/ CBL, Induction, density
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 311 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 311 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7062 ft., Weight: 15.10 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 5963 ft., Bottom: 7062 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 510 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: 513 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6658 ft.
CODELL6906 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/28/2020                 Interval Top: 6908 ft.    Interval Bottom: 6910 ft.

 Completed Information for Formation CODELL
1st Production Date:2/20/1988Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6908 ft.# Of Holes:2
Interval Bottom:6910 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/19/2024                 Interval Top: 6656 ft.    Interval Bottom: 6910 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/20/1988Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2010
Treatment Summary:Niobrarar perfs 6656-6756. Re-Frac'd Niobrara w/ 174,868 gals of Slick Water and Vistar with 249,660#'s of Ottawa sand. Commingle Codell and Niobrara.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 7
BTU_GAS 1371
CALC_BBLS_H2O 8
CALC_BBLS_OIL 7
CALC_GOR 8857
CALC_MCF_GAS 62
CASING_PRESS 550
GRAVITY_OIL 69
MCF_GAS 62
TUBING_PRESS 200
Perforation Data:
Interval Top:6656 ft.# Of Holes:79
Interval Bottom:6910 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/24/2020                 Interval Top: 6656 ft.    Interval Bottom: 6873 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/20/1988Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6656 ft.# Of Holes:77
Interval Bottom:6873 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/19/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No