|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/27/2014 Measured TD: 7271 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/27/2014 | Wellbore Permit | DRIFTED | Permit #: | 19870958 | Expiration Date: | 2/23/1988 | Proposed Depth/Form: | 7250 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: A1-3 , Unit Acreage: 80, Drill Unit: W2NE |
| | |
Wellbore Completed | Completion Date: | 12/12/1987 | Spud Date: | 12/2/1987 | Spud Date Is: | ACTUAL | Measured TD: | 7271 ft. | Measured PB depth: | 7223 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIL,CNL,FDC,CBL. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 307 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 0 ft., Bottom: 307 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7223 ft., Weight: 15.1 , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 6540 ft., Bottom: 7223 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1590 ft. | | N | N | SUSSEX | 4373 ft. | | N | N | NIOBRARA | 6811 ft. | | N | N | FORT HAYS | 7078 ft. | | N | N | CODELL | 7102 ft. | | N | N | CARLILE | 7118 ft. | | N | N | GREENHORN | 7165 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 8/27/2014 Interval Top: 7103 ft. Interval Bottom: 7118 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/13/1987 | Choke Size: | 0.375 in. | Formation Name: | CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/12/1987 | Treatment Summary: | 6817-7116 ACID-1000 GAL. 7 1/2% HCL FRAC-110,000 GAL. X-LINKED FLUID 320,000 LBS. PROPPANT SERVICES-B J TITAN // CODELL UNDER SAND PLUG AT 6935. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7103 ft. | # Of Holes: | 72 | Interval Bottom: | 7118 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/27/2014 Interval Top: 6810 ft. Interval Bottom: 7118 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/28/2009 | Choke Size: | 0.500 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/22/2009 | Treatment Summary: | CODL PERFS 7103-7118. TRI-FRAC'D CODL W/ 128,478 GALS SLICKWATER & VISTAR W/ 244,600# OTTAWA SAND. C OMMINGLE NBRR & CODL. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7068 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/6/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 9 | BTU_GAS | 1282 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 9 | CALC_GOR | 21667 | CALC_MCF_GAS | 195 | CASING_PRESS | 400 | GRAVITY_OIL | 65 | MCF_GAS | 195 | TUBING_PRESS | 300 |
| Perforation Data: | Interval Top: | 6810 ft. | # Of Holes: | 292 | Interval Bottom: | 7118 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 8/27/2014 Interval Top: 6810 ft. Interval Bottom: 6894 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/13/1987 | Choke Size: | 0.219 in. | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/21/2005 | Treatment Summary: | RE-FRAC'D NIOBRARA W/ 69,426 GALS OF SLICKWATER FOLLOWED BY 100,128 GALS OF SILVERSTIM 28# AND 238,820# OF 20/40 OTTAWA SAND PLUS 12000# OF SB EXCEL 12/20 MESH PROPPANT. // 6817-7116 ACID-1000 GAL. 7 1/2% HCL FRAC-110,000 GAL. X-LINKED FLUID 320,000 LBS. PROPPANT SERVICES -B J TITAN |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/2/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 4 | BBLS_OIL | 15 | CALC_GOR | 19600 | CASING_PRESS | 200 | MCF_GAS | 294 |
| Perforation Data: | Interval Top: | 6810 ft. | # Of Holes: | 228 | Interval Bottom: | 6894 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 08/27/2014 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|