|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/14/2022 Measured TD: 7300 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/14/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 19870803 | Expiration Date: | 2/28/1988 | | Proposed Depth/Form: | 7300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBCSX , Formation: NIOBRARA-CODELL-SUSSEX , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 1/26/1988 | | Spud Date: | 11/29/1987 | Spud Date Is: | ACTUAL | | Measured TD: | 7300 ft. | Measured PB depth: | 7246 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL,FDC-GR, DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 341 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 341 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7300 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1300, Top: 4200 ft., Bottom: 7300 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4456 ft. | | N | N | | NIOBRARA | 6844 ft. | | N | N | | FORT HAYS | 7124 ft. | | N | N | | CODELL | 7147 ft. | | N | N |
Formation NBRR Formation Classification: GW Status: CM - 1/23/2004 Interval Top: 6890 ft. Interval Bottom: 7070 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/10/2002 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/26/1988 | | Treatment Summary: | SET CIBP @ 7140. MIX & PLACE 1 SX OF CMT ON CIBP. PERF'D NBRR FROM 6890'-6920', 7040'-7070' W/2 SPF. TIH W/FRAC PKR. SET PKR. FRAC'D W/91,100 GAL GEL & 167,769# 20/40 SAND. FLOW BACK FRAC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/23/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 19 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 19 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 14833 | | CALC_MCF_GAS | 178 | | MCF_GAS | 178 | | TUBING_PRESS | 105 |
| | Perforation Data: | | Interval Top: | 6890 ft. | # Of Holes: | 120 | | Interval Bottom: | 7070 ft. | Hole Size: | 0.35 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/14/2022 Interval Top: 6871 ft. Interval Bottom: 7162 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/26/1988 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/18/2009 | | Treatment Summary: | NB-CD REFRAC. SET CBP @ 7190'. 11/16/09. REFRACD CODL W/ 252,200# 20/40 SND IN 1910 BBLS VISTAR 28 XLF. STAGED SAND FROM 1# TO 5#. 11/18/09. TOTAL GELLED FLUID: 2807 BBL. TOTAL FRAC FLUID 2896 BBLS. 11/18/09. SEE OPER'S COMMENTS FOR NBRR INFO. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 15 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 14000 | | CALC_MCF_GAS | 210 | | CASING_PRESS | 568 | | MCF_GAS | 210 | | TUBING_PRESS | 357 |
| | Perforation Data: | | Interval Top: | 6871 ft. | # Of Holes: | 176 | | Interval Bottom: | 7162 ft. | Hole Size: | 0.375 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 1/22/2002 Interval Top: 4426 ft. Interval Bottom: 4484 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 5/7/1993 | Choke Size: | 0.218 in. | | Formation Name: | SUSSEX | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/26/1988 | | Treatment Summary: | SET BP@4606' & PKR @4573'. TEST BP&REMOVE PKR. LAND TBG @ 4507'. SQUEEZE SUSSEX W/25 SXS PREMIUM. DRILLED SOFT CMT & RESQUEEZE W/25 SXS PREMIUM. DRILL OUT CMT. POOH W/ BP. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4399 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/7/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 13 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 15384 | | CALC_MCF_GAS | 200 | | CASING_PRESS | 540 | | GRAVITY_OIL | 61.4 | | MCF_GAS | 200 | | TUBING_PRESS | 380 |
| | Perforation Data: | | Interval Top: | 4426 ft. | # Of Holes: | 45 | | Interval Bottom: | 4484 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/14/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|