Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12894
Well Classification: OW Status: PR - 6/1/2021
Well Name/No:LIGGETT #18-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2021
FacilityID:245099LocationID:323350
County:WELD #123Location:SWNW 18 4N63W 6
Field:WATTENBERG - #90750Elevation:4630 ft.
Planned Location:1650FNL  990 FWLLat/Long: 40.314897 / -104.486132Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.314998 / -104.486122Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/6/2012
End Date: 2/6/2012
Reported: 3/8/2012
Prior to rule 205A.b.(2)(A)
Days to report: 31
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2021             Measured TD: 7310 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2021
Wellbore PermitDRIFTED
Permit #:19851797 Expiration Date:4/12/1986
Prop Depth/Form:7400 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit:

Wellbore Completed
Completion Date:3/11/1986
Spud Date:12/19/1985Spud Date Is:ACTUAL
Measured TD:7310 ft.Measured PB depth:6775 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, CNL, CDL, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 332 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 332 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7298 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 6130 ft., Bottom: 7298 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6482 ft.NN
CODELL6741 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/23/2012                Interval Top: 6743 ft.    Interval Bottom: 6755 ft.

 Completed Information for Formation CODELL
1st Production Date:3/11/1986Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/6/2012
Treatment Summary:Re-Frac'd Codell w/ 138973 gals of Slick water and Vistar with 238669#'s of Ottawa sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6743 ft.# Of Holes:40
Interval Bottom:6755 ft.Hole Size:0.21 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 6/1/2021                  Interval Top: 6484 ft.    Interval Bottom: 6755 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:48.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/11/1986
Treatment Summary:NBRR (6484'-6635') AND CODL (6743'-6755'): 108,000 GALS X-LINKED FLUID; 343,000# PROPPANT
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/17/2012Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 11
BTU_GAS 1351
CALC_BBLS_H2O 6
CALC_BBLS_OIL 11
CALC_GOR 1000
CALC_MCF_GAS 11
CASING_PRESS 700
GRAVITY_OIL 55
MCF_GAS 11
Perforation Data:
Interval Top:6484 ft.# Of Holes:51
Interval Bottom:6755 ft.Hole Size:0.375 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/23/2012                Interval Top: 6484 ft.    Interval Bottom: 6636 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/11/1986Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6484 ft.# Of Holes:11
Interval Bottom:6636 ft.Hole Size:
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
08/07/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)243
Total Gas Produced (MCF)1908
GOR7851
GOR DeterminationBOE
Average BOE per Day1.561
Average MCFE per Day9.073

 Federal Financial Assurance  i 

 Tribal Well  i No