Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12892
Well Classification: GW Status: PA - 3/25/2020
Well Name/No:ISHIGURO #5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/25/2020
FacilityID:245097LocationID:323348
Municipality/County:EVANS / WELD #123Location:SWNE 36 5N66W 6
Field:WATTENBERG - #90750Elevation:4660 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1905FNL  1825 FELLat/Long: 40.358061 / -104.722397Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.358060 / -104.722400Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/29/2012
End Date: 2/29/2012
Reported: 3/22/2012
Prior to rule 205A.b.(2)(A)
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/25/2020             Measured TD: 7256 ft.    Vertical TD: 7256 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/25/2020
Wellbore Permit
Permit #: Expiration Date:5/26/2012
Proposed Depth/Form:7250 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 521 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 521 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7248 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 6154 ft., Bottom: 7248 ft.

Wellbore Completed
Completion Date:3/14/1986
Spud Date:12/22/1985Spud Date Is:ACTUAL
Measured TD:7256 ft.Measured PB depth:7210 ft.
True Vertical TD:7256 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 531 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 531 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7244 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6154 ft., Bottom: 7244 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6817 ft.
CODELL7132 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/12/2012                 Interval Top: 7132 ft.    Interval Bottom: 7146 ft.

 Completed Information for Formation CODELL
1st Production Date:3/17/1986Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/29/2012
Treatment Summary:CD PERF 7132-7146 HOLES 45 SIZE 0.38 Trifrac CODL down 2.875" tbg w/ pkr ^ ni w/ 204,834 gal slickwater w/ 154,000# 40/70, 4,000# 20/40. Broke @ 3,467 psi @ 4.9 bpm. ATP=6,375 psi; MTP=6,815 psi; ATR=26.8 bpm; ISDP= psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7132 ft.# Of Holes:45
Interval Bottom:7146 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/25/2020                 Interval Top: 6824 ft.    Interval Bottom: 7146 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/8/1993Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/29/2012
Treatment Summary:NB PERF 6824-7021 HOLES 58 SIZE 0.38 CD PERF 7132-7146 HOLES 45 SIZE 0.38 3/16/2012 RETURNED WELL TO PRODUCTION AFTER CDTF-NBRF
Formation Treatment
Treatment Date:3/14/1986
Treatment Summary:FRACED W/ 120,022 GALLONS GELLED FLUID, , 263500 LBS 20/40 UNIMIN - LUCERNE, 0 LBS, 0 LBS PERF. CODELL 7132-42, 3 PRODUCTION REFLECTS NIOBRARA-CODELL FORMAITONS
Tubing Size:2.375 in.Tubing Setting Depth:7113 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/19/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1275
CALC_BBLS_OIL 3
CALC_GOR 27813
CALC_MCF_GAS 89
CASING_PRESS 1325
GRAVITY_OIL 61
MCF_GAS 89
TUBING_PRESS 1300
Perforation Data:
Interval Top:6824 ft.# Of Holes:103
Interval Bottom:7146 ft.Hole Size:0.3 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/23/2012                 Interval Top: 6824 ft.    Interval Bottom: 7021 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/8/1993Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/29/2012
Treatment Summary:NB PERF 6824-7021 HOLES 58 SIZE 0.38 Refrac NBRR down 2.875" tbg w/ pkr ^ ni w/ 252 gal 15% HCl & 448,098 gal slickwater w/ 198,360# 40/70, 4,000# 20/40. Broke @ 4,322 psi @ 8.2 bpm. ATP=6,235 psi; MTP=6,514 psi; ATR=25.9 bpm; ISDP=3,664 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6824 ft.# Of Holes:58
Interval Bottom:7021 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/25/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No