Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12892
Well Classification: GW Status: PA - 3/25/2020
Well Name/No:ISHIGURO #5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/25/2020
FacilityID:245097LocationID:323348
Municipality/County:EVANS / WELD #123Location:SWNE 36 5N66W 6
Field:WATTENBERG - #90750Elevation:4660 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1905FNL  1825 FELLat/Long: 40.358061 / -104.722397Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.358060 / -104.722400Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/29/2012
End Date: 2/29/2012
Reported: 3/22/2012
Prior to rule 205A.b.(2)(A)
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/25/2020             Measured TD: 7256 ft.    Vertical TD: 7256 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/25/2020
Wellbore Permit
Permit #: Expiration Date:5/26/2012
Proposed Depth/Form:7250 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 521 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 521 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7248 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 6154 ft., Bottom: 7248 ft.

Wellbore Completed
Completion Date:3/14/1986
Spud Date:12/22/1985Spud Date Is:ACTUAL
Measured TD:7256 ft.Measured PB depth:7210 ft.
True Vertical TD:7256 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 531 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 531 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7244 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6154 ft., Bottom: 7244 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6817 ft.
CODELL7132 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/12/2012                 Interval Top: 7132 ft.    Interval Bottom: 7146 ft.

 Completed Information for Formation CODELL
1st Production Date:3/17/1986Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/29/2012
Treatment Summary:CD PERF 7132-7146 HOLES 45 SIZE 0.38 Trifrac CODL down 2.875" tbg w/ pkr ^ ni w/ 204,834 gal slickwater w/ 154,000# 40/70, 4,000# 20/40. Broke @ 3,467 psi @ 4.9 bpm. ATP=6,375 psi; MTP=6,815 psi; ATR=26.8 bpm; ISDP= psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7132 ft.# Of Holes:45
Interval Bottom:7146 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/25/2020                 Interval Top: 6824 ft.    Interval Bottom: 7146 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/8/1993Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/29/2012
Treatment Summary:NB PERF 6824-7021 HOLES 58 SIZE 0.38 CD PERF 7132-7146 HOLES 45 SIZE 0.38 3/16/2012 RETURNED WELL TO PRODUCTION AFTER CDTF-NBRF
Formation Treatment
Treatment Date:3/14/1986
Treatment Summary:FRACED W/ 120,022 GALLONS GELLED FLUID, , 263500 LBS 20/40 UNIMIN - LUCERNE, 0 LBS, 0 LBS PERF. CODELL 7132-42, 3 PRODUCTION REFLECTS NIOBRARA-CODELL FORMAITONS
Tubing Size:2.375 in.Tubing Setting Depth:7113 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/19/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1275
CALC_BBLS_OIL 3
CALC_GOR 27813
CALC_MCF_GAS 89
CASING_PRESS 1325
GRAVITY_OIL 61
MCF_GAS 89
TUBING_PRESS 1300
Perforation Data:
Interval Top:6824 ft.# Of Holes:103
Interval Bottom:7146 ft.Hole Size:0.3 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/23/2012                 Interval Top: 6824 ft.    Interval Bottom: 7021 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/8/1993Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/29/2012
Treatment Summary:NB PERF 6824-7021 HOLES 58 SIZE 0.38 Refrac NBRR down 2.875" tbg w/ pkr ^ ni w/ 252 gal 15% HCl & 448,098 gal slickwater w/ 198,360# 40/70, 4,000# 20/40. Broke @ 4,322 psi @ 8.2 bpm. ATP=6,235 psi; MTP=6,514 psi; ATR=25.9 bpm; ISDP=3,664 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6824 ft.# Of Holes:58
Interval Bottom:7021 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/25/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No