Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12862
Well Classification: OW Status: PA - 4/20/2022
Well Name/No:NELSON #12-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:55811
Facility Status:PAStatus Date4/20/2022
FacilityID:245067LocationID:323322
County:WELD #123Location:NWSW 22 6N65W 6
Field:WATTENBERG - #90750Elevation:4708 ft.
Planned Location:1980FSL  660 FWLLat/Long: 40.469814 / -104.656549Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.469855 / -104.656582Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/20/2022             Measured TD: 7180 ft.    Vertical TD: 7180 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/20/2022
Wellbore PermitDRIFTED
Permit #:851723 Expiration Date:4/1/1986
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:2/27/1986
Measured TD:7180 ft.Measured PB depth:7140 ft.
True Vertical TD:7180 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 351 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 351 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7190 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 5961 ft., Bottom: 7190 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7190 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 1800 ft., Bottom: 2300 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6756 ft.
CODELL7066 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/18/2010                Interval Top: 7068 ft.    Interval Bottom: 7079 ft.

 Completed Information for Formation CODELL
1st Production Date:9/30/1986Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:3/11/2010
Treatment Summary:NO ADDITIONAL INFORMATION
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7068 ft.# Of Holes:65
Interval Bottom:7079 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/20/2022                 Interval Top: 6758 ft.    Interval Bottom: 7079 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/22/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/11/2010
Treatment Summary:NBRR PERF 6758-6963 HOLES 36 SIZE 0.42 CODL PERF 7068-7079 HOLES 65 SIZE 0.38.
Tubing Size:2.375 in.Tubing Setting Depth:7048 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/5/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 6
BTU_GAS 1308
CALC_BBLS_OIL 6
CALC_GOR 11167
CALC_MCF_GAS 67
CASING_PRESS 750
GRAVITY_OIL 46
MCF_GAS 67
TUBING_PRESS 475
Perforation Data:
Interval Top:6758 ft.# Of Holes:101
Interval Bottom:7079 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/18/2010                Interval Top: 6758 ft.    Interval Bottom: 6963 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/22/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/11/2010
Treatment Summary:REPERF NBRR 6762-6906 HOLES 28 SIZE 0.42. REFRAC NBRR W/500 GAL 15%HCL & 167,009 GAL SUPER Z HYBRID & 250,960# 20/40 SAND & 4,000# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6758 ft.# Of Holes:36
Interval Bottom:6963 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/20/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No