Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12833
Well Classification: GW Status: TA - 8/17/2020
Well Name/No:EDITH ANN #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date8/17/2020
FacilityID:245038LocationID:323300
County:WELD #123Location:NESE 21 2N68W 6
Field:WATTENBERG - #90750Elevation:4904 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1650FSL  930 FELLat/Long: 40.121457 / -105.002196Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.121425 / -105.002063Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 8/17/2020             Measured TD: 8090 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 8/17/2020
Wellbore Permit
Permit #:20030918 Expiration Date:6/2/2004
Proposed Depth/Form:8090 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407,407-66, Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:1/30/2004
Spud Date:11/27/1985Spud Date Is:ACTUAL
Measured TD:8090 ft.Measured PB depth:8062 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTON-SFL & FDC/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 525 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 525 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8097 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 6620 ft., Bottom: 8097 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4409 ft.NN
SHANNON4820 ft.NN
NIOBRARA7234 ft.NN
FORT HAYS7496 ft.NN
CODELL7518 ft.NN
J SAND7946 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  TA - 8/17/2020                 Interval Top: 7958 ft.    Interval Bottom: 7974 ft.

 Completed Information for Formation J SAND
1st Production Date:12/14/1990Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/30/2004
Treatment Summary:580,000# 20-40 SAND, 200,000 GALS FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 66
BBLS_OIL 8
CALC_BBLS_H2O 66
CALC_BBLS_OIL 8
CALC_GOR 97500
CALC_MCF_GAS 780
CASING_PRESS 1180
MCF_GAS 780
TUBING_PRESS 850
Perforation Data:
Interval Top:7958 ft.# Of Holes:20
Interval Bottom:7974 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/5/1996                  Interval Top: 7520 ft.    Interval Bottom: 7538 ft.

 Completed Information for Formation CODELL
1st Production Date:5/4/1996Choke Size:0.375 in.
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:1/30/2004
Treatment Summary:FRAC'D W/ 111,800 GALS SATURN III 35, 10,000# 100 MESH, 392,000# 20-40 SAND, & 8,000# 12/20 RESIN-COATED SAND
Tubing Size:2.375 in.Tubing Setting Depth:7498 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/1996Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 21
CALC_BBLS_H2O 5
CALC_BBLS_OIL 21
CALC_GOR 6381
CALC_MCF_GAS 134
MCF_GAS 134
TUBING_PRESS 340
Perforation Data:
Interval Top:7520 ft.# Of Holes:36
Interval Bottom:7538 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 7/5/1996                  Interval Top: 7520 ft.    Interval Bottom: 7974 ft.

 Completed Information for Formation J-CODELL
1st Production Date:7/5/1996Choke Size:0.375 in.
Formation Name:J-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7508 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/3/1996Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 18.5
CALC_BBLS_H2O 6
CALC_BBLS_OIL 18.5
CALC_GOR 9135
CALC_MCF_GAS 169
CASING_PRESS 400
MCF_GAS 169
TUBING_PRESS 180
Perforation Data:
Interval Top:7520 ft.# Of Holes:56
Interval Bottom:7974 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/30/2004                 Interval Top: 7240 ft.    Interval Bottom: 7974 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/30/2004Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:1/30/2004
Treatment Summary:POOH W/RBP. TIH W/PRODUCTION TBG, LAND EOT @ 7935P'. BROACH TO SN, SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7935 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/30/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 1
CALC_BBLS_H2O 6
CALC_BBLS_OIL 1
CALC_GOR 59000
CALC_MCF_GAS 59
CASING_PRESS 500
MCF_GAS 59
TUBING_PRESS 300
Perforation Data:
Interval Top:7240 ft.# Of Holes:416
Interval Bottom:7974 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 8/17/2020                 Interval Top: 7240 ft.    Interval Bottom: 7538 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/8/2003Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7240 ft.# Of Holes:396
Interval Bottom:7538 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/30/2004                 Interval Top: 7240 ft.    Interval Bottom: 7440 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/8/2003Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:1/30/2004
Treatment Summary:SEE SCANNED DOC #01273343
Tubing Size:2.375 in.Tubing Setting Depth:7212 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/8/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 9
CASING_PRESS 1300
MCF_GAS 9
TUBING_PRESS 140
Perforation Data:
Interval Top:7240 ft.# Of Holes:360
Interval Bottom:7440 ft.Hole Size:0.38 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY04/07/2026
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA)YLast Production
09/30/2018
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No