Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12630
Well Classification: GW Status: PA - 3/21/2019
Well Name/No:COSSLETT B UNIT #1X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/21/2019
FacilityID:244835LocationID:323151
County:WELD #123Location:SENE 22 1N68W 6
Field:WATTENBERG - #90750Elevation:5182 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1465FNL  1188 FELLat/Long: 40.039888 / -104.984275Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.039937 / -104.984291Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/21/2019             Measured TD: 8598 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/21/2019
Wellbore Permit
Permit #:19970984 Expiration Date:12/23/1998
Proposed Depth/Form:8600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:5/19/1998
Spud Date:9/2/1985Spud Date Is:ACTUAL
Measured TD:8598 ft.Measured PB depth:
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DIL, CNL, LITHO
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 830 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 830 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8512 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 7901 ft., Bottom: 8512 ft., Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7886 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 7021 ft., Bottom: 7886 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4810 ft.
NIOBRARA7607 ft.
TIMPAS7970 ft.
CODELL7991 ft.
GREENHORN8024 ft.
J SAND8367 ft.
DAKOTA8530 ft.

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 2/16/1999                 Interval Top: 8530 ft.

 Completed Information for Formation DAKOTA
1st Production Date:N/AChoke Size: 
Formation Name:DAKOTACommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DKTA.
No Perforation Data was found for formation DKTA.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 3/21/2019                 Interval Top: 8372 ft.    Interval Bottom: 8388 ft.

 Completed Information for Formation J SAND
1st Production Date:7/9/1987Choke Size:0.000 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:5/19/1998
Treatment Summary:FRAC W/ 325,000# 20/40 M IN 99,300 GAL GEL
Tubing Size:2.375 in.Tubing Setting Depth:8338 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/9/1987Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 440
GRAVITY_OIL 81
TUBING_PRESS 440
Perforation Data:
Interval Top:8372 ft.# Of Holes:48
Interval Bottom:8388 ft.Hole Size:

Formation DKJNC                   Formation Classification:  GW                   Status:  CM - 3/21/2019                 Interval Top: 7610 ft.    Interval Bottom: 8388 ft.

 Completed Information for Formation DAKOTA-J-NIOBRARA-CODELL
1st Production Date:5/19/1998Choke Size: 
Formation Name:DAKOTA-J-NIOBRARA-CODELLCommingled:Yes
Production Method:PLUNGER 500
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:8247 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/17/1998Test Method:PLUNGER 500
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 34
CALC_GOR 91176
MCF_GAS 31
Perforation Data:
Interval Top:7610 ft.# Of Holes:364
Interval Bottom:8388 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/21/2019                 Interval Top: 7610 ft.    Interval Bottom: 8008 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/3/2009
Treatment Summary:NBRR-CDL REFRAC AND RECOMPLETION *REFER TO OPERATOR COMMENTS FOR DETAILS*
Tubing Size:2.375 in.Tubing Setting Depth:7702 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/3/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 20
BTU_GAS 1176
CALC_BBLS_H2O 15
CALC_BBLS_OIL 20
CALC_GOR 2000
CALC_MCF_GAS 40
CASING_PRESS 1107
GRAVITY_OIL 48
MCF_GAS 40
TUBING_PRESS 1003
Perforation Data:
Interval Top:7610 ft.# Of Holes:312
Interval Bottom:8008 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/21/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No