|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/17/2016 Measured TD: 7270 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/17/2016 | | Wellbore Permit | | | Permit #: | 851022 | Expiration Date: | 12/5/1985 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/19/2013 | | Spud Date: | 8/13/1985 | Spud Date Is: | ACTUAL | | Measured TD: | 7270 ft. | Measured PB depth: | 7220 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 305 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 305 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7270 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 6174 ft., Bottom: 7270 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 524 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 365 ft., Bottom: 524 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 4673 ft. | | | | | NIOBRARA | 6860 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 1/24/1985 Interval Top: 7174 ft. Interval Bottom: 7196 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/24/1985 | | Treatment Summary: | 134,316 GAL VISTAR 28/26# GEL & 246,940# 20/40 OTTAWA SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7165 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/12/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 28 | | CALC_BBLS_H2O | 22 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 9 | | CALC_MCF_GAS | 248 | | MCF_GAS | 248 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7174 ft. | # Of Holes: | 88 | | Interval Bottom: | 7196 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/17/2016 Interval Top: 6985 ft. Interval Bottom: 7196 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/9/2009 | Choke Size: | 0.750 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/5/2009 | | Treatment Summary: | CODL PERFS 7174-7196. TRI FRAC CODL W/ 131,250 GALS VISTAR W/ 242,384# OTTAWA SAND. COMMINGLE NBRR & CODL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7148 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/20/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 5 | | BTU_GAS | 1330 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 13400 | | CALC_MCF_GAS | 67 | | CASING_PRESS | 540 | | GRAVITY_OIL | 57 | | MCF_GAS | 67 | | TUBING_PRESS | 520 |
| | Perforation Data: | | Interval Top: | 6985 ft. | # Of Holes: | 94 | | Interval Bottom: | 7196 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 11/20/2009 Interval Top: 6985 ft. Interval Bottom: 6997 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/5/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6985 ft. | # Of Holes: | 6 | | Interval Bottom: | 6997 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/17/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|