Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12518
Well Classification: GW Status: TA - 10/21/2021
Well Name/No:CARLSON #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:67114
Facility Status:TAStatus Date10/21/2021
FacilityID:244723LocationID:323073
County:WELD #123Location:SENE 32 5N66W 6
Field:WATTENBERG - #90750Elevation:4791 ft.
Planned Location:1980FNL  660 FELLat/Long: 40.357735 / -104.796532Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.357981 / -104.796345Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 10/21/2021             Measured TD: 7390 ft.    Vertical TD: 7390 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 10/21/2021
Wellbore Permit
Permit #:850858 Expiration Date:10/18/1994
Prop Depth/Form:
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/4/1985
Measured TD:7390 ft.Measured PB depth:7330 ft.
True Vertical TD:7390 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 330 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 330 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 323 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7368 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 5876 ft., Bottom: 7368 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7368 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5150 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 395, Top: 4820 ft., Bottom: 5232 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4363 ft.
SHANNON4808 ft.
NIOBRARA6918 ft.
FORT HAYS7224 ft.
CODELL7246 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/21/2021                Interval Top: 7233 ft.    Interval Bottom: 7264 ft.

 Completed Information for Formation CODELL
1st Production Date:3/3/1986Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/4/1985
Treatment Summary:CLEANED OUT SAND PLUG TO COMMINGLE WITH THE NIOBRARA
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 18
CALC_BBLS_H2O 8
CALC_BBLS_OIL 18
CALC_GOR 17
CALC_MCF_GAS 310
CASING_PRESS 425
MCF_GAS 310
TUBING_PRESS 200
Perforation Data:
Interval Top:7233 ft.# Of Holes:72
Interval Bottom:7264 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 10/21/2021                Interval Top: 6924 ft.    Interval Bottom: 7264 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/3/1986Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/4/2009
Treatment Summary:CODL PERFS 7233-7264. TRI-FRAC'D CODL W/ 128,436 GALS VISTAR W/ 241,042# OTTAWA SND. COMMINGLE NBRR & CODL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 2
BTU_GAS 1271
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_GOR 34000
CALC_MCF_GAS 68
CASING_PRESS 430
GRAVITY_OIL 56
MCF_GAS 68
TUBING_PRESS 170
Perforation Data:
Interval Top:6924 ft.# Of Holes:320
Interval Bottom:7264 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/21/2021                Interval Top: 6924 ft.    Interval Bottom: 7144 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/3/1986Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/4/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 10
CALC_BBLS_H2O 11
CALC_BBLS_OIL 10
CALC_GOR 9100
CALC_MCF_GAS 91
CASING_PRESS 180
MCF_GAS 91
Perforation Data:
Interval Top:6924 ft.# Of Holes:248
Interval Bottom:7144 ft.Hole Size:0.42 in.

Formation SNSD                     Formation Classification:  GW                     Status:  AB - 6/26/2002                 Interval Top: 4810 ft.    Interval Bottom: 4836 ft.

 Completed Information for Formation SHANNON
1st Production Date:3/28/1994Choke Size: 
Formation Name:SHANNONCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/4/1985
Treatment Summary:SQUEEZED 6/26/02 W/150 SX CLASS "G" 15.8#CEMENT
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SNSD.
Perforation Data:
Interval Top:4810 ft.# Of Holes:24
Interval Bottom:4836 ft.Hole Size:
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
08/12/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
09/30/2016
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No