|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/1/2024 Measured TD: 8200 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/1/2024 | Wellbore Permit | | Permit #: | 20086834 | Expiration Date: | 10/27/2009 | Prop Depth/Form: | 8200 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 160, Drill Unit: NW4 | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 160, Drill Unit: NW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 712 ft., Weight: 28 , Citings Type: PLANNED | Cement: | Sacks: 330, Top: 11 ft., Bottom: 723 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8197 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 325, Top: 6900 ft., Bottom: 8200 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 6/10/1985 | Spud Date Is: | ACTUAL | Measured TD: | 8200 ft. | Measured PB depth: | 8110 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIL-SP-GR-SFL-CNL-FDC-GR | Log Types: | CBL-GR-CCL RUN 12/29/2008 FOR SQUEEZE | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 712 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 330, Top: 0 ft., Bottom: 712 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8197 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 6622 ft., Bottom: 8197 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8197 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 4175 ft., Bottom: 5055 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1206 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 120, Top: 530 ft., Bottom: 1206 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4370 ft. | | | | SHANNON | 4788 ft. | | | | NIOBRARA | 7259 ft. | | | | CODELL | 7560 ft. | | | | J SAND | 7988 ft. | | | |
Formation JSND Formation Classification: OG Status: AB - 5/1/2024 Interval Top: 8005 ft. Interval Bottom: 8025 ft. Completed Information for Formation J SAND | 1st Production Date: | 5/18/2000 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/11/2011 | Treatment Summary: | CIBP REMOVED @ 4960'. JSND/CD/NB SHOULD HAVE HAD A STATUS OF TA'D. RETURNED DL WITH SHANNON AND SUSSEX ON 2/24/2011. | Formation Treatment | Treatment Date: | 6/23/2000 | Treatment Summary: | CIBP OVER NB/CD/JSAND @ 4960'. TWO SACKS OF CEMENT ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CEMENT AND CIBP AND COMMINGLE THE WELL WITHIN THE NEXT SIX WEEKS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 0 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 530 | MCF_GAS | 530 |
| Perforation Data: | Interval Top: | 8005 ft. | # Of Holes: | 80 | Interval Bottom: | 8025 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 9/10/2009 Interval Top: 7563 ft. Interval Bottom: 7573 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/23/2000 | Treatment Summary: | CIBP OVER NB/CD/JSAND @ 4960'. TWO SACKS OF CEMENT ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CEMENT AND CIBP AND COMMINGLE THE WELL WITHIN THE NEXT SIX MONTHS |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 1 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 1 | CALC_GOR | 17000 | CALC_MCF_GAS | 17 | CASING_PRESS | 170 | GRAVITY_OIL | 53 | MCF_GAS | 17 | TUBING_PRESS | 130 |
| Perforation Data: | Interval Top: | 7563 ft. | # Of Holes: | 20 | Interval Bottom: | 7573 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/2/2009 Interval Top: 7340 ft. Interval Bottom: 8025 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 5/18/2000 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/2/2009 | Treatment Summary: | CIBP SET @ 4960' W/ 2 SX CEMENT ON TOP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP & CEMENT TO COMMINGLE WELL WITHIN NEXT 6 MONTHS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 3 | CALC_BBLS_OIL | 3 | CALC_GOR | 17333 | CALC_MCF_GAS | 52 | CASING_PRESS | 350 | GRAVITY_OIL | 6 | MCF_GAS | 52 | TUBING_PRESS | 250 |
| Perforation Data: | Interval Top: | 7340 ft. | # Of Holes: | 220 | Interval Bottom: | 8025 ft. | Hole Size: | 0.48 in. |
|
Formation NB-CD Formation Classification: OG Status: AB - 5/1/2024 Interval Top: 7340 ft. Interval Bottom: 7573 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/18/2000 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/11/2011 | Treatment Summary: | CIBP REMOVED @ 4960'. JSND/CD/NB SHOULD HAVE HAD A STATUS OF TA'D. RETURNED DL WITH SHANNON AND SUSSEX ON 2/24/2011. | Formation Treatment | Treatment Date: | 6/23/2000 | Treatment Summary: | FRAC'D NBRR W/ 7,520# 100 MESH; 27,7260# 20/40 MESH; 87,276 GAL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 3 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 3 | CALC_GOR | 17333 | CALC_MCF_GAS | 52 | CASING_PRESS | 350 | GRAVITY_OIL | 60 | MCF_GAS | 52 | TUBING_PRESS | 250 |
| Perforation Data: | Interval Top: | 7340 ft. | # Of Holes: | 60 | Interval Bottom: | 7573 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 2/11/2009 Interval Top: 7340 ft. Interval Bottom: 7350 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/23/2000 | Treatment Summary: | CIBP OVER NB/CD/JSAND @ 4960'. TWO SACKS OF CEMENT ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CEMENT AND CIBP AND COMMINGLE THE WELL WITHIN THE NEXT SIX WEEKS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7340 ft. | # Of Holes: | 40 | Interval Bottom: | 7350 ft. | Hole Size: | 0.35 in. |
|
Formation SNSD Formation Classification: GW Status: CM - 5/2/2011 Interval Top: 4798 ft. Interval Bottom: 4808 ft. Completed Information for Formation SHANNON | 1st Production Date: | 1/28/2009 | Choke Size: | | Formation Name: | SHANNON | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/27/2009 | Treatment Summary: | NO ADDITIONAL TREATMENT. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1296 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 32 | CASING_PRESS | 700 | GRAVITY_OIL | 50 | TUBING_PRESS | 700 |
| Perforation Data: | Interval Top: | 4798 ft. | # Of Holes: | 30 | Interval Bottom: | 4808 ft. | Hole Size: | 0.42 in. |
|
Formation JNCSS Formation Classification: OG Status: CM - 4/28/2011 Interval Top: 4376 ft. Interval Bottom: 8025 ft. Completed Information for Formation JSND-CODL-NIO-SUSX-SHAN | 1st Production Date: | 2/24/2011 | Choke Size: | | Formation Name: | JSND-CODL-NIO-SUSX-SHAN | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/11/2011 | Treatment Summary: | CIBP REMOVED @ 4960'. JSND/CD/NB SHOULD HAVE HAD A STATUS OF TA'D. RETURNED DL WITH SHANNON AND SUSSEX ON 2/24/2011. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/28/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1319 | CALC_MCF_GAS | 6 | CASING_PRESS | 710 | GRAVITY_OIL | 50 | MCF_GAS | 6 |
| Perforation Data: | Interval Top: | 4376 ft. | # Of Holes: | 206 | Interval Bottom: | 8025 ft. | Hole Size: | 0.42 in. |
|
Formation SUSX Formation Classification: GW Status: CM - 5/2/2011 Interval Top: 4376 ft. Interval Bottom: 4394 ft. Completed Information for Formation SUSSEX | 1st Production Date: | 12/29/2009 | Choke Size: | | Formation Name: | SUSSEX | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/27/2009 | Treatment Summary: | FRAC SUSX W/ 21,084 GAL MAVFOAM H70 QUALITY N2 (1105 MSCF N2) W/180,020 # 16/30 SAND & 20,500# 12/20 RESIN COAT SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SUSX. |
| Perforation Data: | Interval Top: | 4376 ft. | # Of Holes: | 36 | Interval Bottom: | 4394 ft. | Hole Size: | 0.42 in. |
|
Formation SX-SN Formation Classification: GW Status: AB - 5/1/2024 Interval Top: 4376 ft. Interval Bottom: 4808 ft. Completed Information for Formation SUSSEX-SHANNON | 1st Production Date: | 12/29/2009 | Choke Size: | | Formation Name: | SUSSEX-SHANNON | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/27/2009 | Treatment Summary: | SUSX PERF 4376 - 7394, HOLES 36, SIZE 0.42 // SHAN PERF 4798 - 4808, HOLES 30, SIZE 0.42 // |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4730 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/3/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1174 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 12 | CALC_GOR | 5750 | CALC_MCF_GAS | 69 | CASING_PRESS | 722 | GRAVITY_OIL | 49 | TUBING_PRESS | 730 |
| Perforation Data: | Interval Top: | 4376 ft. | # Of Holes: | 66 | Interval Bottom: | 4808 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 05/01/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|