|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/26/2026 Measured TD: 8010 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/26/2026 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 3/29/2013 | | Proposed Depth/Form: | 8006 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: S2NW | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: S2NW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 670 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 670 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8006 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 325, Top: 6740 ft., Bottom: 8006 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4710 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 3890 ft., Bottom: 4710 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 6/11/1985 | Spud Date Is: | ACTUAL | | Measured TD: | 8010 ft. | Measured PB depth: | 7962 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | | | Log Types: | INDUCTION, COMP. DENSITY, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 670 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 670 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8006 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 6740 ft., Bottom: 8006 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 723 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 166, Top: 0 ft., Bottom: 723 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4710 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 3890 ft., Bottom: 4710 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 70 ft., Depth: 723 ft., Bottom: 712 ft., Sacks: 166, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4419 ft. | | N | N | | NIOBRARA | 7150 ft. | | N | N | | CODELL | 7396 ft. | | N | N | | J SAND | 7834 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 2/26/2026 Interval Top: 7838 ft. Interval Bottom: 7888 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/1/1986 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/1/1986 | | Treatment Summary: | 7838; 7840; 7842; 7844, 7846; 7848; 7850; 7872; 7874; 7876; 7878; 7880; 7882; 7884; 7886, 7888
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 78 | | BBLS_OIL | 6 | | CALC_GOR | 147500 | | CASING_PRESS | 580 | | GRAVITY_OIL | 48 | | MCF_GAS | 885 | | TUBING_PRESS | 210 |
| | Perforation Data: | | Interval Top: | 7838 ft. | # Of Holes: | 16 | | Interval Bottom: | 7888 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 2/26/2026 Interval Top: 7398 ft. Interval Bottom: 7412 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/11/1996 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/5/2011 | | Treatment Summary: | original perfs 1996 with 28 holes, refrac 2011 did not reperf
| | Formation Treatment | | Treatment Date: | 12/1/1986 | | Treatment Summary: | FRAC'D W/111,333 GALS. SATURN III W/10,320# 100 MESH, 392,000# 20/40 SD AND 8,140# 12/20 TDC RESIN COATED SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 44 | | CALC_GOR | 5705 | | CASING_PRESS | 160 | | MCF_GAS | 251 |
| | Perforation Data: | | Interval Top: | 7398 ft. | # Of Holes: | 28 | | Interval Bottom: | 7412 ft. | Hole Size: | 3.125 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/31/1998 Interval Top: 7398 ft. Interval Bottom: 7888 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 1/30/1998 | Choke Size: | 0.500 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7836 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/1/1998 | Test Method: | PLUNGER 500 | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 16 | | CALC_GOR | 20313 | | CASING_PRESS | 280 | | MCF_GAS | 325 | | TUBING_PRESS | 130 |
| | Perforation Data: | | Interval Top: | 7398 ft. | # Of Holes: | 44 | | Interval Bottom: | 7888 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 2/26/2026 Interval Top: 7176 ft. Interval Bottom: 7412 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/12/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2011 | | Treatment Summary: | PERFED NIOBRARA 7290--7250, 7202-7176 W/ 2SPF. FRAC'D W/147798 GAL FRAC FLUID AND 24800 # SAND
FRAC CODELL W/ 115794 GAL FRAC FLUID AND 250020 # SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7176 ft. | # Of Holes: | 160 | | Interval Bottom: | 7412 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 3/4/2026 Interval Top: 7176 ft. Interval Bottom: 7290 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2011 | | Treatment Summary: | 7176 - 7202; 7250 - 7290
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7176 ft. | # Of Holes: | 132 | | Interval Bottom: | 7290 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: AB - 2/26/2026 Interval Top: 4644 ft. Interval Bottom: 4664 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/1/1997 | | Treatment Summary: | squeezed off Sussex 12/19/1997 from 3890 - 4710 with 200 sks cmt
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 3 | | CASING_PRESS | 2 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 4644 ft. | # Of Holes: | 40 | | Interval Bottom: | 4664 ft. | Hole Size: | 0.38 in. |
|
Formation JDCNB Formation Classification: OW Status: CM - 4/12/2011| Completed Information for Formation J-D-CODELL-NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-D-CODELL-NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/12/2011 | | Treatment Summary: | DRILLED OUT PLUGS @ 7330' AND 7460 ON 4/6/11'. LANDED 2-3/8" TUBING @ 7813' ON 4/6/2011/ COMMINGLED ON 4/10/2011 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 78163 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/12/2011 | Test Method: | FLOWING | | Hours Tested: | 10 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 12 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 30620 | | CALC_MCF_GAS | 888 | | CASING_PRESS | 376 | | GRAVITY_OIL | 51 | | MCF_GAS | 133 | | TUBING_PRESS | 316 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 02/29/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|