Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12420
Well Classification: OW Status: PA - 5/12/2015
Well Name/No:MAUL #20-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KP KAUFFMAN COMPANY INC - 46290
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/12/2015
FacilityID:244625LocationID:323004
County:WELD #123Location:SENE 20 1N65W 6
Field:WATTENBERG - #90750Elevation:4962 ft.
Planned Location:1650FNL  990 FELLat/Long: 40.039787 / -104.682029Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.039787 / -104.682029Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/17/2012
End Date: 5/17/2012
Reported: 5/24/2012
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 5/12/2015             Measured TD: 7900 ft.    Vertical TD: 7900 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 5/12/2015
Wellbore Permit
Permit #: Expiration Date:3/5/2014
Proposed Top PZ Location:Sec:20 Twp: 1N 65W Footage: 1650 FNL  990 FEL
Bottom Hole Location:Sec:20 Twp: 1N 65W Footage: 1650 FNL  990 FEL
Proposed Depth/Form:7900 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2NE/4
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 211 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 211 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7900 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 6380 ft., Bottom: 7900 ft.

Wellbore Completed
Completion Date:6/5/1985
Spud Date:5/29/1985Spud Date Is:ACTUAL
Measured TD:7900 ft.Measured PB depth:7900 ft.
True Vertical TD:7900 ft.True Vertical PB depth:7900 ft.
Top PZ Location:Sec:20 Twp: 1N 65WFootage: 1650 FNL  990 FEL
Bottom Hole Location:Sec:20 Twp: 1N 65WFootage: 1650 N  990 E
Log Types:CBL
Log Types:DUAL INDUCTION-GUARD/DENSITY-NEUTRON/CEMENT BOND
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 211 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 211 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7900 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 6400 ft., Bottom: 7900 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1130 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 952 ft., Bottom: 1280 ft., Determination Method:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 873 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 211 ft., Bottom: 874 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 300 ft., Depth: 873 ft., Bottom: 1130 ft., Sacks: 100, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
FOX HILLS780 ft.NN
SUSSEX4703 ft.NN
NIOBRARA6987 ft.
FORT HAYS7333 ft.NN
CODELL7356 ft.
GREENHORN7427 ft.NN
BENTONITE7641 ft.NN
D SAND7736 ft.NN
J SAND7795 ft.NN
SKULL CREEK7874 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  CM - 6/17/2015                 Interval Top: 7799 ft.    Interval Bottom: 7832 ft.

 Completed Information for Formation J SAND
1st Production Date:6/27/1985Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/14/1985
Treatment Summary:282,000# 20/40 SAND, 85,000 GAL MY-T-GEL 1400
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 3
CALC_GOR 153
CASING_PRESS 1000
MCF_GAS 460
TUBING_PRESS 500
Perforation Data:
Interval Top:7799 ft.# Of Holes:21
Interval Bottom:7832 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/17/2015                 Interval Top: 7356 ft.    Interval Bottom: 7370 ft.

 Completed Information for Formation CODELL
1st Production Date:6/2/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/17/2012
Treatment Summary:9 psi load and break formation 3918 psi 2.0 bpm pump 1000 gal 15%HCL acid 4585 psi-10.5 bpm let acid soak. ISIP 2665 psi 1 min 2644 psi 5 min 2585 psi leakoff 59 psi. begin FR water Pad @ 3925 psi @10.5 bpm begin Linear gel with 0.25 ppg 30/50 Ottawa @6513 psi @ 23.9 bpm 0.25 ppg on formation @6415 psi @23.8 bpm begin ramped 1.50 ppg Ottawa 30/50 @6063 psi @24.0 bpm begin ramped 2.0 ppg Ottawa @5688 psi @24.1 bpm begin ramped 3.0 ppg Ottawa 30/50 @ 5741 psi @ 24.1 bpm begin 4.0 ppg CRC @5718 psi at 24.1 bpm mark flush pump 47 bbls FR water 5 bbls over flush. ISIP 3128 PSI 5 MIN 2993 PSI 10 MIN 2955 PSI LEAKOFF 38 PSI. AVG PRESS 5808 PSI RATE 22.2 BPM MAX PRESS 6993 PSI . RATE 24.4 BPM PUMPED 1190.0 BBLS FR Water 2029.9 BBLS SLF. 140,900 # 30/50 Ottawa 10,000 # CRC. LOAD TO RECOVER 3312.8 BBLS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 10
BTU_GAS 1148
CALC_BBLS_H2O 2
CALC_BBLS_OIL 10
CALC_GOR 1500
CALC_MCF_GAS 15
CASING_PRESS 185
GRAVITY_OIL 49
MCF_GAS 15
TUBING_PRESS 185
Perforation Data:
Interval Top:7356 ft.# Of Holes:42
Interval Bottom:7370 ft.Hole Size:0.4285714 in.

Formation J-CDL                   Formation Classification:  OW                   Status:  AB - 5/12/2015                 Interval Top: 7356 ft.    Interval Bottom: 7832 ft.

 Completed Information for Formation J-CODELL
1st Production Date:5/12/2015Choke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:7698 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2015Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 2
BTU_GAS 1148
CALC_BBLS_H2O 1
CALC_BBLS_OIL 2
CALC_GOR 3500
CALC_MCF_GAS 7
CASING_PRESS 185
GRAVITY_OIL 49
MCF_GAS 7
TUBING_PRESS 185
Perforation Data:
Interval Top:7356 ft.# Of Holes:63
Interval Bottom:7832 ft.Hole Size:0.4285714 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/12/2015
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No