|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/12/2015 Measured TD: 7900 ft. Vertical TD: 7900 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/12/2015 | Wellbore Permit | | Permit #: | | Expiration Date: | 3/5/2014 | Proposed Top PZ Location: | Sec:20 Twp: 1N 65W | Footage: 1650 FNL 990 FEL | Bottom Hole Location: | Sec:20 Twp: 1N 65W | Footage: 1650 FNL 990 FEL | Proposed Depth/Form: | 7900 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2NE/4 | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 211 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 211 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7900 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 6380 ft., Bottom: 7900 ft. |
| | |
Wellbore Completed | Completion Date: | 6/5/1985 | Spud Date: | 5/29/1985 | Spud Date Is: | ACTUAL | Measured TD: | 7900 ft. | Measured PB depth: | 7900 ft. | True Vertical TD: | 7900 ft. | True Vertical PB depth: | 7900 ft. | Top PZ Location: | Sec:20 Twp: 1N 65W | Footage: 1650 FNL 990 FEL | Bottom Hole Location: | Sec:20 Twp: 1N 65W | Footage: 1650 N 990 E | Log Types: | CBL | Log Types: | DUAL INDUCTION-GUARD/DENSITY-NEUTRON/CEMENT BOND | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 211 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 211 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7900 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 6400 ft., Bottom: 7900 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1130 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 50, Top: 952 ft., Bottom: 1280 ft., Determination Method: | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 873 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 211 ft., Bottom: 874 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 300 ft., Depth: 873 ft., Bottom: 1130 ft., Sacks: 100, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 780 ft. | | N | N | SUSSEX | 4703 ft. | | N | N | NIOBRARA | 6987 ft. | | | | FORT HAYS | 7333 ft. | | N | N | CODELL | 7356 ft. | | | | GREENHORN | 7427 ft. | | N | N | BENTONITE | 7641 ft. | | N | N | D SAND | 7736 ft. | | N | N | J SAND | 7795 ft. | | N | N | SKULL CREEK | 7874 ft. | | N | N |
Formation JSND Formation Classification: OW Status: CM - 6/17/2015 Interval Top: 7799 ft. Interval Bottom: 7832 ft. Completed Information for Formation J SAND | 1st Production Date: | 6/27/1985 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/14/1985 | Treatment Summary: | 282,000# 20/40 SAND, 85,000 GAL MY-T-GEL 1400 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 40 | BBLS_OIL | 3 | CALC_GOR | 153 | CASING_PRESS | 1000 | MCF_GAS | 460 | TUBING_PRESS | 500 |
| Perforation Data: | Interval Top: | 7799 ft. | # Of Holes: | 21 | Interval Bottom: | 7832 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 6/17/2015 Interval Top: 7356 ft. Interval Bottom: 7370 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/2/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/17/2012 | Treatment Summary: | 9 psi load and break formation 3918 psi 2.0 bpm pump
1000 gal 15%HCL acid 4585 psi-10.5 bpm let acid soak.
ISIP 2665 psi 1 min 2644 psi 5 min 2585 psi leakoff 59 psi.
begin FR water Pad @ 3925 psi @10.5 bpm begin Linear gel
with 0.25 ppg 30/50 Ottawa @6513 psi @ 23.9 bpm 0.25 ppg
on formation @6415 psi @23.8 bpm begin ramped 1.50 ppg
Ottawa 30/50 @6063 psi @24.0 bpm begin ramped 2.0 ppg
Ottawa @5688 psi @24.1 bpm begin ramped 3.0 ppg Ottawa
30/50 @ 5741 psi @ 24.1 bpm begin 4.0 ppg CRC @5718 psi
at 24.1 bpm mark flush pump 47 bbls FR water 5 bbls over flush.
ISIP 3128 PSI 5 MIN 2993 PSI 10 MIN 2955 PSI LEAKOFF 38 PSI.
AVG PRESS 5808 PSI RATE 22.2 BPM MAX PRESS 6993 PSI .
RATE 24.4 BPM PUMPED 1190.0 BBLS FR Water 2029.9 BBLS
SLF. 140,900 # 30/50 Ottawa 10,000 # CRC.
LOAD TO RECOVER 3312.8 BBLS.
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 10 | BTU_GAS | 1148 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 10 | CALC_GOR | 1500 | CALC_MCF_GAS | 15 | CASING_PRESS | 185 | GRAVITY_OIL | 49 | MCF_GAS | 15 | TUBING_PRESS | 185 |
| Perforation Data: | Interval Top: | 7356 ft. | # Of Holes: | 42 | Interval Bottom: | 7370 ft. | Hole Size: | 0.4285714 in. |
|
Formation J-CDL Formation Classification: OW Status: AB - 5/12/2015 Interval Top: 7356 ft. Interval Bottom: 7832 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 5/12/2015 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7698 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/12/2015 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 2 | BTU_GAS | 1148 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 2 | CALC_GOR | 3500 | CALC_MCF_GAS | 7 | CASING_PRESS | 185 | GRAVITY_OIL | 49 | MCF_GAS | 7 | TUBING_PRESS | 185 |
| Perforation Data: | Interval Top: | 7356 ft. | # Of Holes: | 63 | Interval Bottom: | 7832 ft. | Hole Size: | 0.4285714 in. |
|
|
|
|
|
Reported Plugged | Y | 05/12/2015 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|