|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/19/2019 Measured TD: 8185 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/19/2019 | | Wellbore Permit | | | Permit #: | 20030858 | Expiration Date: | 5/27/2004 | | Proposed Depth/Form: | 8185 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 6/30/2003 | | Spud Date: | 3/13/1985 | Spud Date Is: | ACTUAL | | Measured TD: | 8185 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL IND, COMP. DENS | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 717 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 396, Top: 0 ft., Bottom: 717 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8186 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 6530 ft., Bottom: 8186 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5242 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 5115 ft., Bottom: 5242 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4554 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 4047 ft., Bottom: 4554 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX-SHANNON | 4450 ft. | | N | N | | NIOBRARA | 7312 ft. | | N | N | | TIMPAS | 7581 ft. | | N | N | | CODELL | 7604 ft. | | N | N | | GREENHORN | 7656 ft. | | N | N | | J SAND | 8014 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/19/2019 Interval Top: 8028 ft. Interval Bottom: 8060 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/10/1985 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/30/2003 | | Treatment Summary: | ACIDIZED W/ 1,000 GALS 7.5% HCL ACID. FRAC'D W/ 107,776 GALS VERSAGEL, 325,000# 20-40 SAND, FLUSH W/ 5,240 GALS 2% KCL WATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8030 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/10/1985 | Test Method: | FLOWING | | Hours Tested: | 15 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2.69 | | BBLS_OIL | 3.36 | | CALC_BBLS_H2O | 4.3 | | CALC_BBLS_OIL | 5.38 | | CALC_MCF_GAS | 1210 | | CASING_PRESS | 1150 | | MCF_GAS | 758 | | TUBING_PRESS | 880 |
| | Perforation Data: | | Interval Top: | 8028 ft. | # Of Holes: | 88 | | Interval Bottom: | 8060 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 2/19/2019 Interval Top: 7604 ft. Interval Bottom: 7621 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/30/2003 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/30/2003 | | Treatment Summary: | SET RBP @ 6700' W/ 2 SX SAND ON TOP. RUN 1-1/4" TBG DOWN 8-5/8" SURFACE CSG AND 4-1/2" PROD CSG TO 4570'. CMT ANNULAS W/ 200 SXS OF PREMIUM CMT. 15.8# PER GAL. WOC. RUN CBL TOP OF CMT @ 4047', BTM OF CMT AT 4554'. PERF'D 4-1/2" CSG AT 5250' SET PKR AT 5000' AND CMT. AT PERFS W/ 200 SXS OF CLASS "G". WOC. DRILLOUT CMT. TEST PERFS AT 5250 TO 500 PSI. HELD OKAY. CLEAN OUT TO TD AND RETURN WELL TO PRODUCTION FROM CODELL AND JSAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/30/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 8 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 291 | | CALC_MCF_GAS | 2 | | CASING_PRESS | 680 | | MCF_GAS | 2 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7604 ft. | # Of Holes: | 68 | | Interval Bottom: | 7621 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/19/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|