Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12218
Well Classification: GW Status: PA - 10/17/2016
Well Name/No:SANDUSKY #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:62442
Facility Status:PAStatus Date10/17/2016
FacilityID:244424LocationID:322888
County:WELD #123Location:SWNW 15 5N65W 6
Field:WATTENBERG - #90750Elevation:4646 ft.
Planned Location:1980FNL  660 FWLLat/Long: 40.401005 / -104.656558Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.401149 / -104.656701Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/17/2016             Measured TD: 7125 ft.    Vertical TD: 7125 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/17/2016
Wellbore PermitDRIFTED
Permit #:841931 Expiration Date:4/29/1985
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:1/26/1985
Spud Date:12/29/1984Spud Date Is:ACTUAL
Measured TD:7125 ft.Measured PB depth:7076 ft.
True Vertical TD:7125 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 346 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 245, Top: 0 ft., Bottom: 346 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7128 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6200 ft., Bottom: 7128 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT HAYS7002 ft.
CODELL7024 ft.
CARLILE7042 ft.
GREENHORN7079 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/21/2003                Interval Top: 7028 ft.    Interval Bottom: 7038 ft.

 Completed Information for Formation CODELL
1st Production Date:3/10/1985Choke Size:18.000 in.
Formation Name:CODELLCommingled:No
Production Method:PLUNGER
Open Hole Completion:No
Formation Treatment
Treatment Date:1/26/1985
Treatment Summary:FRACED W/124,026 GALLONS GELLED FLUID., 262400 LBS 20/40 BRIGHTON-UNIMIN-OTTAWA.,PRODUCTION REFLECTS NIOBRARA-CODELL FORMATIONS
Tubing Size:2.375 in.Tubing Setting Depth:6996 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/21/2003Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 3
CALC_BBLS_H2O 0
CALC_BBLS_OIL 3
CALC_GOR 27000
CALC_MCF_GAS 81
CASING_PRESS 489
MCF_GAS 81
TUBING_PRESS 384
Perforation Data:
Interval Top:7028 ft.# Of Holes:33
Interval Bottom:7038 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/17/2016

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No