Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12058
Well Classification: GW Status: PA - 10/18/2021
Well Name/No:HARVEST #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:56055
Facility Status:PAStatus Date10/18/2021
FacilityID:244264LocationID:322791
County:WELD #123Location:SENE 32 6N65W 6
Field:GREELEY - #32760Elevation:4682 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  600 FELLat/Long: 40.445214 / -104.679939Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.445662 / -104.679819Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/18/2021             Measured TD: 7188 ft.    Vertical TD: 7188 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/18/2021
Wellbore Permit
Permit #:841518 Expiration Date:2/17/1985
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:11/16/1985
Spud Date:10/31/1984Spud Date Is:ACTUAL
Measured TD:7188 ft.Measured PB depth:7165 ft.
True Vertical TD:7188 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 334 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 334 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7178 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 6208 ft., Bottom: 7188 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3050 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 520 ft., Bottom: 3050 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 3008 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 520 ft., Bottom: 3050 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4320 ft.
NIOBRARA6731 ft.
FORT HAYS7040 ft.
CODELL7064 ft.
CARLILE7082 ft.
GREENHORN7116 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/17/2009                 Interval Top: 7064 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/16/1985
Treatment Summary:9/14/06 SET BP @7050' W/1 SX CEMENT. REMOVE BP TO COMMINGLE NB-CD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/7/2019                  Interval Top: 6750 ft.    Interval Bottom: 7078 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/9/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/16/1985
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 5
BTU_GAS 1307
CALC_GOR 7600
CASING_PRESS 440
GRAVITY_OIL 55
MCF_GAS 38
TUBING_PRESS 420
Perforation Data:
Interval Top:6750 ft.# Of Holes:187
Interval Bottom:7078 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/1/2006                 Interval Top: 6750 ft.    Interval Bottom: 6964 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size:0.310 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/18/2006
Treatment Summary:FRAC'D W/4406 BBLS FRAC FLUID & 238,000# OTTAW SAND & 12,000# 12/20 SB EXCEL SAND
Tubing Size:2.375 in.Tubing Setting Depth:6743 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/1/2006Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 47
BTU_GAS 1283
CALC_GOR 4106
CASING_PRESS 1350
GRAVITY_OIL 51
MCF_GAS 193
TUBING_PRESS 1000
Perforation Data:
Interval Top:6750 ft.# Of Holes:160
Interval Bottom:6964 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/18/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No