Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12050
Well Classification: GW Status: PA - 2/13/2025
Well Name/No:WHITE #34-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:69087
Facility Status:PAStatus Date2/13/2025
FacilityID:244256LocationID:322785
County:WELD #123Location:NWNW 34 5N64W 6
Field:WATTENBERG - #90750Elevation:4638 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  660 FWLLat/Long: 40.361266 / -104.542894Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.361111 / -104.542778Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 2/13/2025             Measured TD: 6940 ft.    Vertical TD: 6940 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 2/13/2025
Wellbore PermitDRIFTED
Permit #:841493 Expiration Date:2/8/1985
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:12/15/1984
Spud Date:11/2/1984Spud Date Is:ACTUAL
Measured TD:6940 ft.Measured PB depth:0 ft.
True Vertical TD:6940 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 346 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 346 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6920 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 5856 ft., Bottom: 6920 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4270 ft.
SHANNON5452 ft.
NIOBRARA6520 ft.
FORT HAYS6768 ft.
CODELL6805 ft.
GREENHORN6865 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/19/2025                 Interval Top: 6804 ft.    Interval Bottom: 6820 ft.

 Completed Information for Formation CODELL
1st Production Date:12/16/1984Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/15/1984
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6804 ft.# Of Holes:53
Interval Bottom:6820 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/13/2025                 Interval Top: 6522 ft.    Interval Bottom: 6820 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/26/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6522 ft.# Of Holes:481
Interval Bottom:6820 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/19/2025                 Interval Top: 6522 ft.    Interval Bottom: 6710 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/26/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/23/2008
Treatment Summary:FRAC'D W/4,036 BBLS FRAC FLUID & 238,947# OTTAWA 30/50 SAND & 12,364# 12/20 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 46
BBLS_OIL 72
BTU_GAS 1313
CALC_GOR 4375
GRAVITY_OIL 51
MCF_GAS 315
Perforation Data:
Interval Top:6522 ft.# Of Holes:428
Interval Bottom:6710 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/13/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No