Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-11921
Well Classification: GW Status: PA - 8/6/2019
Well Name/No:LEY #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/6/2019
FacilityID:244128LocationID:322713
County:WELD #123Location:SWSE 6 4N64W 6
Field:WATTENBERG - #90750Elevation:4819 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  1980 FELLat/Long: 40.335856 / -104.591015Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.335838 / -104.591101Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/6/2019             Measured TD: 7280 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/6/2019
Wellbore PermitDRIFTED
Permit #:20011743 Expiration Date:9/24/2002
Proposed Depth/Form:7700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: E/2

Wellbore Completed
Completion Date:8/9/1984
Spud Date:8/4/1984Spud Date Is:ACTUAL
Measured TD:7280 ft.Measured PB depth:7164 ft.
True Vertical TD:True Vertical PB depth:
Log Types:IEL, CDL, GR, CEMENT BOND
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 434 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 434 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7270 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 5760 ft., Bottom: 7270 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4736 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 3100 ft., Bottom: 4760 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4348 ft.NN
NIOBRARA6793 ft.NN
CODELL7068 ft.NN
TIMPAS7094 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/26/2019                 Interval Top: 7067 ft.    Interval Bottom: 7085 ft.

 Completed Information for Formation CODELL
1st Production Date:7/2/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/29/2019Treatment End Date:N/A
Treatment Summary:6/28/2005: remove sand plug over Codell at 6817'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/2/2005
Treatment Summary:ORIGINAL COMPLETION: SEE DOC #00132282. 7/14/03: REFRAC W/ 130,746 GALS VISTAR 24/25/26# GEL & 245,260# 20-40 OTTAWA SAND. 6/1/05: SAND PLUG SET @6817'. 7/2/05: COMMINGLE W/ NBRR.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 9
BTU_GAS 1283
CALC_BBLS_H2O 2
CALC_BBLS_OIL 9
CALC_GOR 18889
CALC_MCF_GAS 170
CASING_PRESS 550
GRAVITY_OIL 58.2
MCF_GAS 170
TUBING_PRESS 200
Perforation Data:
Interval Top:7067 ft.# Of Holes:79
Interval Bottom:7085 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/6/2019                  Interval Top: 6794 ft.    Interval Bottom: 7085 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/2/2005Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 13
BTU_GAS 1277
CALC_BBLS_H2O 4
CALC_BBLS_OIL 13
CALC_GOR 11231
CALC_MCF_GAS 146
CASING_PRESS 600
GRAVITY_OIL 51.7
MCF_GAS 146
TUBING_PRESS 240
Perforation Data:
Interval Top:6794 ft.# Of Holes:319
Interval Bottom:7085 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/26/2019                 Interval Top: 6794 ft.    Interval Bottom: 6900 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/29/2005Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/2/2005
Treatment Summary:PERF'D NBRR 6794-6812' & 6878-6900' (240 HOLES) 5/24/05. 1,000 GAL 15% HCL. FRAC'D NBRR W/ 71,358 GAL SLICKWATER; 103,236 GAL SILVERSTIM 28# GEL; 238,209# 20/40 OTTAWA SAND & 12,000# 12/20 SB EXCEL, 6/1/05. CLEAN OUT SAND PLUG, RELEASE PACKER & COMMINGLE W/ CODL, 7/2/05.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 23
BTU_GAS 1277
CALC_BBLS_H2O 3
CALC_BBLS_OIL 23
CALC_GOR 6435
CALC_MCF_GAS 148
CASING_PRESS 210
GRAVITY_OIL 51.7
MCF_GAS 148
Perforation Data:
Interval Top:6794 ft.# Of Holes:240
Interval Bottom:6900 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/06/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No