|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/8/2017 Measured TD: 8350 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/8/2017 | | Wellbore Permit | VERTICAL | | Permit #: | 19840226 | Expiration Date: | 3/2/1985 | | Proposed Depth/Form: | 8300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 313, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/7/1994 | | Spud Date: | 3/20/1984 | Spud Date Is: | ACTUAL | | Measured TD: | 8350 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DIL,CDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 714 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 714 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8338 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 6810 ft., Bottom: 8338 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4584 ft. | | | | | SHANNON | 5060 ft. | | | | | NIOBRARA | 7388 ft. | | | | | TIMPAS | 7744 ft. | | | | | CODELL | 7766 ft. | | | | | GREENHORN | 7826 ft. | | | | | J SAND | 8189 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 5/8/2017 Interval Top: 8192 ft. Interval Bottom: 8208 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/6/1986 | Choke Size: | 0.750 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/7/1994 | | Treatment Summary: | FRAC W/ 325,000# 20/40 M IN 99,500 GAL GEL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8181 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/6/1986 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | CASING_PRESS | 450 | | MCF_GAS | 340 | | TUBING_PRESS | 50 |
| | Perforation Data: | | Interval Top: | 8192 ft. | # Of Holes: | 48 | | Interval Bottom: | 8208 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/16/2009 Interval Top: 7388 ft. Interval Bottom: 8208 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/7/1994 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE RELEASED RBP@ 7720' AND 7850' TO COMMINGLE THE JSND-NBRR-CDL. 10/105/09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8177 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/16/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | BBLS_OIL | 30 | | BTU_GAS | 1246 | | CALC_BBLS_H2O | 16 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 133 | | CALC_MCF_GAS | 4 | | CASING_PRESS | 1067 | | GRAVITY_OIL | 48 | | MCF_GAS | 4 | | TUBING_PRESS | 624 |
| | Perforation Data: | | Interval Top: | 7388 ft. | # Of Holes: | 304 | | Interval Bottom: | 8208 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/8/2017 Interval Top: 7388 ft. Interval Bottom: 7784 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/30/2009 | | Treatment Summary: | NBRR-CDL RECOMPLETION, SET RBP@7850' 8/24/09 RE-FRAC'D THE CODELL WITH 115,642 GAL 26# TO 22# VISTAR CROSS LINKED GET HYBRID CONTAINING 259,020# 20/40 SAND. 8/30/09. SET RBP@ 9/22/09. RE-FRAC'D THE NIOBRARA WITH 250,700# 20/40 SAND AND 3365 BBLS VISTAR |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7388 ft. | # Of Holes: | 256 | | Interval Bottom: | 7784 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/08/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|