Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-11563
Well Classification: OW Status: PA - 7/13/2023
Well Name/No:J. Nelson #33-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/13/2023
FacilityID:243771LocationID:319610
County:WELD #123Location:SWNE 33 5N67W 6
Field:JOHNSTOWN - #42600Elevation:4794 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1500FNL  1500 FELLat/Long: 40.359224 / -104.893465Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.359250 / -104.893280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/13/2023             Measured TD: 7552 ft.    Vertical TD: 7552 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/13/2023
Wellbore Permit
Permit #: Expiration Date:8/19/2012
Proposed Depth/Form:7552 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 0, Top: 0 ft., Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7552 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 202, Top: 6152 ft., Bottom: 7552 ft.

Wellbore Completed
Completion Date:6/20/1984
Measured TD:7552 ft.Measured PB depth:7520 ft.
True Vertical TD:7552 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 297 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 297 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7565 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6430 ft., Bottom: 7565 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6615 ft.
FORT HAYS6895 ft.
CODELL6953 ft.
CARLILE6977 ft.
GREENHORN7070 ft.
J SAND7400 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 11/1/2010                 Interval Top: 7425 ft.    Interval Bottom: 7454 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7425 ft.# Of Holes:0
Interval Bottom:7454 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:                       Status:  CM - 6/7/2011                  Interval Top: 6958 ft.    Interval Bottom: 6966 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/14/2010
Treatment Summary:PERF CODELL 6958'-6966'(24 HOLES) FRAC'D CODELL W/720 BBLS OF 22# PHASER PAD, 1911 BBLS OF 22# PHASER, 218000# 30/50
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6958 ft.# Of Holes:24
Interval Bottom:6966 ft.Hole Size:0.35 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/13/2023                 Interval Top: 6638 ft.    Interval Bottom: 6966 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:6943 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 64
BTU_GAS 1193
CALC_BBLS_H2O 20
CALC_BBLS_OIL 64
CALC_GOR 1922
CALC_MCF_GAS 123
CASING_PRESS 900
GRAVITY_OIL 48
MCF_GAS 123
TUBING_PRESS 260
Perforation Data:
Interval Top:6638 ft.# Of Holes:46
Interval Bottom:6966 ft.Hole Size:0.35 in.

Formation NBRR                     Formation Classification:                       Status:  CM - 6/7/2011                  Interval Top: 6638 ft.    Interval Bottom: 6758 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/3/2010
Treatment Summary:PERF NIOBRARA "A" 6638'-6640" (4 HOLES) AND NIOBRARA "B" 6752'-6758' (18 HOLES) FRAC'D NIOBRARA USING 24 BBLS 15% HCL, 1548 BBLS OF SLICKWATER PAD, 143 BBLS OF PHASER 22# PAD, 2315 BBLS 22# PHASER, 250060# 30/50
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6638 ft.# Of Holes:22
Interval Bottom:6758 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/13/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No