|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 7/13/2023 Measured TD: 7552 ft. Vertical TD: 7552 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 7/13/2023 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 8/19/2012 | | Proposed Depth/Form: | 7552 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 0, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7552 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 202, Top: 6152 ft., Bottom: 7552 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/20/1984 | | Measured TD: | 7552 ft. | Measured PB depth: | 7520 ft. | | True Vertical TD: | 7552 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 297 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 297 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7565 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6430 ft., Bottom: 7565 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6615 ft. | | | | | FORT HAYS | 6895 ft. | | | | | CODELL | 6953 ft. | | | | | CARLILE | 6977 ft. | | | | | GREENHORN | 7070 ft. | | | | | J SAND | 7400 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 11/1/2010 Interval Top: 7425 ft. Interval Bottom: 7454 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7425 ft. | # Of Holes: | 0 | | Interval Bottom: | 7454 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: Status: CM - 6/7/2011 Interval Top: 6958 ft. Interval Bottom: 6966 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/14/2010 | | Treatment Summary: | PERF CODELL 6958'-6966'(24 HOLES) FRAC'D CODELL W/720 BBLS OF 22# PHASER PAD, 1911 BBLS OF 22# PHASER, 218000# 30/50 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6958 ft. | # Of Holes: | 24 | | Interval Bottom: | 6966 ft. | Hole Size: | 0.35 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/13/2023 Interval Top: 6638 ft. Interval Bottom: 6966 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6943 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/1/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 64 | | BTU_GAS | 1193 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 64 | | CALC_GOR | 1922 | | CALC_MCF_GAS | 123 | | CASING_PRESS | 900 | | GRAVITY_OIL | 48 | | MCF_GAS | 123 | | TUBING_PRESS | 260 |
| | Perforation Data: | | Interval Top: | 6638 ft. | # Of Holes: | 46 | | Interval Bottom: | 6966 ft. | Hole Size: | 0.35 in. |
|
Formation NBRR Formation Classification: Status: CM - 6/7/2011 Interval Top: 6638 ft. Interval Bottom: 6758 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/3/2010 | | Treatment Summary: | PERF NIOBRARA "A" 6638'-6640" (4 HOLES) AND NIOBRARA "B" 6752'-6758' (18 HOLES) FRAC'D NIOBRARA USING 24 BBLS 15% HCL, 1548 BBLS OF SLICKWATER PAD, 143 BBLS OF PHASER 22# PAD, 2315 BBLS 22# PHASER, 250060# 30/50 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6638 ft. | # Of Holes: | 22 | | Interval Bottom: | 6758 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/13/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|