|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/17/1984 Measured TD: 6130 ft. Vertical TD: 5174 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/17/1984 | Wellbore Permit | DIRECTIONAL | Permit #: | 19831378 | Expiration Date: | 2/28/1984 | Prop Depth/Form: | 5500 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 40, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 3/26/1984 | Spud Date: | 11/6/1983 | Spud Date Is: | ACTUAL | Measured TD: | 6130 ft. | Measured PB depth: | 6085 ft. | True Vertical TD: | 5174 ft. | True Vertical PB depth: | 5133 ft. | Top PZ Location: | Sec:31 Twp: 2N 67W | Footage: 1836 FNL 2093 FWL | Depth | Bottom Hole Location: | Sec:31 Twp: 2N 67W | Footage: 1870 FNL 2153 FWL | Depth | Log Types: | SP-IES, FDC-GR CALIPER LOG | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: , Depth: 981 ft., Weight: 28 , Citings Type: ACTUAL | Cement: | Sacks: 600, Top: , Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: , Depth: 6131 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5356 ft. | | N | N | SHANNON | 5976 ft. | | N | N |
Formation SNSD Formation Classification: Status: CM - 3/17/1984 Interval Top: 5978 ft. Interval Bottom: 6001 ft. Completed Information for Formation SHANNON | 1st Production Date: | N/A | Choke Size: | | Formation Name: | SHANNON | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SNSD. |
| Perforation Data: | Interval Top: | 5978 ft. | # Of Holes: | 96 | Interval Bottom: | 6001 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: CM - 3/17/1984 Interval Top: 5366 ft. Interval Bottom: 5458 ft. Completed Information for Formation SUSSEX | 1st Production Date: | 3/17/1984 | Choke Size: | | Formation Name: | SUSSEX | Commingled: | | Production Method: | ROD PUMP | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SUSX. |
| Perforation Data: | Interval Top: | 5366 ft. | # Of Holes: | 372 | Interval Bottom: | 5458 ft. | Hole Size: | |
|
Formation SX-SN Formation Classification: GW Status: PR - 3/17/1984 Interval Top: 5366 ft. Interval Bottom: 6001 ft. Completed Information for Formation SUSSEX-SHANNON | 1st Production Date: | 3/17/1984 | Choke Size: | | Formation Name: | SUSSEX-SHANNON | Commingled: | | Production Method: | ROD PUMP | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/26/1984 | Treatment Summary: | SUSX (5366'-5458' TMD, 368 HOLES): 430 BO X 465 BW - FLUSH W/ 123 BW - 265,000# 20-40 SN X 10,500# 20-40 RESIN-COATED SN. SNSD (5978'-6001' TMD, 92 HOLES): 1,233 BO X 1,063 BW X 256,000# 20-40 SN X 10,000# 20-40 RESIN-COATED SN, FLUSH X 133 BW. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/26/1984 | Test Method: | ROD PUMP | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 13 | BBLS_OIL | 75 | CALC_BBLS_H2O | 13 | CALC_BBLS_OIL | 75 | CALC_GOR | 1626 | CALC_MCF_GAS | 122 | GRAVITY_OIL | 41.5 | MCF_GAS | 122 |
| Perforation Data: | Interval Top: | 5366 ft. | # Of Holes: | 460 | Interval Bottom: | 6001 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 2891 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 1.365 |
Average MCFE per Day | 7.906 |
Federal Financial Assurance | i | |
|
|