Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-11367
Well Classification: OW Status: PA - 4/26/2021
Well Name/No:THOMSEN USX X #7-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/26/2021
FacilityID:243575LocationID:319500
County:WELD #123Location:CNE 7 2N65W 6
Field:WATTENBERG - #90750Elevation:4914 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1320FNL  1320 FELLat/Long: 40.156608 / -104.701967Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.156841 / -104.701772Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/26/2021             Measured TD: 7925 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/26/2021
Wellbore Permit
Permit #:19831084 Expiration Date:4/11/2002
Proposed Depth/Form:7925 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:7/4/1984
Spud Date:10/8/1983Spud Date Is:ACTUAL
Measured TD:7925 ft.Measured PB depth:7880 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES, FDC-GR CALIPER, GAMMA RAY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 852 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 852 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7920 ft., Weight: 1.6/10 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 4250 ft., Bottom: 7920 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4305 ft.
SHANNON4935 ft.
NIOBRARA7024 ft.
CODELL7298 ft.
BENTONITE7582 ft.
J SAND7748 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 4/26/2021                 Interval Top: 7750 ft.    Interval Bottom: 7810 ft.

 Completed Information for Formation J SAND
1st Production Date:2/24/1984Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:7/4/1984
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 5
CALC_GOR 68000
GRAVITY_OIL 57.3
MCF_GAS 340
Perforation Data:
Interval Top:7750 ft.# Of Holes:240
Interval Bottom:7810 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/26/2021                 Interval Top: 7076 ft.    Interval Bottom: 7312 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/9/2011Choke Size:32.000 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/3/2011
Treatment Summary:Codell perfs 7300-7312. (48 holes). Re-Frac's Codell w/ 125,287 gals of Vistar 24,25,26, and Slick Water with 244,580#'s of Ottawa sand. Commingle Codell and Niobrara.
Formation Treatment
Treatment Date:7/4/1984
Treatment Summary:1000 GAL 15% HCL, 35,700 GAL FR WTR, 20,000 GAL FR WTR W/1/2#/GAL SAND, 23,000 GAL FR WTR W/1# GAL SAND, 105,600 GAL SILVERSTIM 350,080# 20/40 SAND. CODELL PERFS: 7300-12'. NIOBRARA PERFS 7076-90', 7155-62', 7172-88', 4SPF.
Tubing Size:2.375 in.Tubing Setting Depth:7285 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/24/2011Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 30
BTU_GAS 1286
CALC_BBLS_H2O 10
CALC_BBLS_OIL 30
CALC_GOR 12300
CALC_MCF_GAS 6
CASING_PRESS 744
GRAVITY_OIL 52
MCF_GAS 6
TUBING_PRESS 604
Perforation Data:
Interval Top:7076 ft.# Of Holes:196
Interval Bottom:7312 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/16/2011                Interval Top: 7076 ft.    Interval Bottom: 7188 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7076 ft.# Of Holes:148
Interval Bottom:7188 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/26/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No