|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/6/2017 Measured TD: 8135 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/6/2017 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 9/22/2010 | | Proposed Depth/Form: | 8135 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 160, Drill Unit: SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 959 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 525, Top: 13 ft., Bottom: 959 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8134 ft., Weight: 10.5/11.6, Citings Type: PLANNED | | Cement: | Sacks: 700, Top: 6000 ft., Bottom: 8134 ft. | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6000 ft., Weight: 10.5/11.6, Citings Type: PLANNED | | Cement: | Sacks: 336, Top: 3380 ft., Bottom: 6000 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1420 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 1000 ft., Bottom: 1420 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/8/1984 | | Spud Date: | 8/29/1983 | Spud Date Is: | ACTUAL | | Measured TD: | 8135 ft. | Measured PB depth: | 8018 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES, FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 959 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 525, Top: 100 ft., Bottom: 959 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8132 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1362, Top: 4300 ft., Bottom: 8132 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 336, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 0 ft. | | N | N | | SUSSEX | 4500 ft. | | N | N | | SHANNON | 5125 ft. | | N | N | | NIOBRARA | 7110 ft. | | N | N | | CODELL | 7476 ft. | | N | N | | BENTONITE | 7754 ft. | | N | N | | J SAND | 7918 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 12/6/2017 Interval Top: 7922 ft. Interval Bottom: 7966 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/27/2010 | | Treatment Summary: | Drill out sand plug set @ 7720' to commingle JSND w/ NB-CD. | | Formation Treatment | | Treatment Date: | 4/8/1984 | | Treatment Summary: | 11/25/09 SAND PLUG PLACED AT 7600' TO MAINTAIN MECHANICAL INTEGRITY IN WELL. OUR INTENT IS TO DRILL OUT THE SAND PLUG TO COMMINGLE THE WELL WITHIN THE NEXT 6 MONTHS, |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 5 | | BTU_GAS | 1238 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 3000 | | CALC_MCF_GAS | 15 | | CASING_PRESS | 271 | | GRAVITY_OIL | 42 | | MCF_GAS | 15 | | TUBING_PRESS | 218 |
| | Perforation Data: | | Interval Top: | 7922 ft. | # Of Holes: | 176 | | Interval Bottom: | 7966 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/18/2010 Interval Top: 7476 ft. Interval Bottom: 7492 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/25/2009 | | Treatment Summary: | 120,218 GAL PHASER W/261,360# 20/40 & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7476 ft. | # Of Holes: | 32 | | Interval Bottom: | 7492 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 12/6/2017 Interval Top: 7244 ft. Interval Bottom: 7492 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/5/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/1/2010 | | Treatment Summary: | NBRR Perf 7244-7336 Holes 48 Size 0.42 CODL Perf 7476-7492 Holes 32 Size 0.38
No additional treatment. | | Formation Treatment | | Treatment Date: | 4/8/1984 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1238 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 10 | | CASING_PRESS | 271 | | GRAVITY_OIL | 42 | | MCF_GAS | 10 | | TUBING_PRESS | 218 |
| | Perforation Data: | | Interval Top: | 7244 ft. | # Of Holes: | 80 | | Interval Bottom: | 7492 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/18/2010 Interval Top: 7244 ft. Interval Bottom: 7336 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/25/2009 | | Treatment Summary: | 500 GAL 15% HC1 & 169,220 GAL PHASER W/250,760# 20/40 & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7244 ft. | # Of Holes: | 48 | | Interval Bottom: | 7336 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/06/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|