|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/17/2022 Measured TD: 8100 ft. Vertical TD: 8100 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/17/2022 | Wellbore Permit | | Permit #: | 830797 | Expiration Date: | 11/22/1983 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: MDDYJ , Formation: MUDDY J , Order: 0 , Unit Acreage: 320, Drill Unit: W2 |
| | |
Wellbore Completed | Completion Date: | 4/8/1985 | Spud Date: | 7/21/1983 | Spud Date Is: | ACTUAL | Measured TD: | 8100 ft. | Measured PB depth: | 8046 ft. | True Vertical TD: | 8100 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1060 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1060 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8099 ft., Weight: 15.5, 17 , Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 5000 ft., Bottom: 8099 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4800 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 4450 ft., Bottom: 4845 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4200 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 3950 ft., Bottom: 4236 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4105 ft. | | | | SUSSEX | 4440 ft. | | | | SHANNON | 4660 ft. | | | | NIOBRARA | 7136 ft. | | | | CODELL | 7448 ft. | | | | J SAND | 7902 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/17/2022 Interval Top: 7900 ft. Interval Bottom: 7950 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/8/1985 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/2/2021 | Treatment End Date: | N/A | Treatment Summary: | CIBP was removed after the refrac of the Codell formation and the Codell and J Sand were commingled per Form 5A doc #79603. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7900 ft. | # Of Holes: | 200 | Interval Bottom: | 7950 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: AB - 10/17/2022 Interval Top: 7450 ft. Interval Bottom: 7466 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/30/1997 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/2/2021 | Treatment End Date: | N/A | Treatment Summary: | CIBP was removed after the refrac of the Codell formation and the Codell and J Sand were commingled per Form 5A doc #79603. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7450 ft. | # Of Holes: | 64 | Interval Bottom: | 7466 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 8/3/2021 Interval Top: 7450 ft. Interval Bottom: 7950 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 6/30/1997 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/8/1985 | Treatment Summary: | 01/2000 # 100 MESH # 20/40 MESH GAL. GELLED FLUID TEST PRODUCTION REPRESENTS J-CDL FORMATIONS |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 7 | CALC_BBLS_OIL | 7 | CALC_GOR | 6857 | CALC_MCF_GAS | 48 | CASING_PRESS | 520 | GRAVITY_OIL | 60 | MCF_GAS | 48 | TUBING_PRESS | 480 |
| Perforation Data: | Interval Top: | 7450 ft. | # Of Holes: | 264 | Interval Bottom: | 7950 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 10/17/2022 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|