Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-11207
Well Classification: GW Status: PA - 10/18/2022
Well Name/No:UPRR 42 PAN AM "AT" #TRUE 1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/18/2022
FacilityID:243416LocationID:319410
Municipality/County:FORT LUPTON / WELD #123Location:SESE 33 2N66W 6
Field:SPINDLE - #77900Elevation:4980 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  990 FELLat/Long: 40.090038 / -104.776289Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.090106 / -104.776245Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/18/2022             Measured TD: 8100 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/18/2022
Wellbore Permit
Permit #:20075737 Expiration Date:1/10/2009
Proposed Depth/Form:8100 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 160, Drill Unit: SE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1050 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 575, Top: 0 ft., Bottom: 1050 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8096 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1310, Top: 3500 ft., Bottom: 8096 ft.

Wellbore Completed
Completion Date:2/10/1984
Spud Date:6/19/1983Spud Date Is:ACTUAL
Measured TD:8100 ft.Measured PB depth:8051 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES, FDC-GR CALIPER LOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1050 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1050 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8096 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1310, Top: 3540 ft., Bottom: 8096 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4664 ft.
SHANNON4762 ft.
NIOBRARA7168 ft.
CODELL7490 ft.
BENTONITE7766 ft.
J SAND7956 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 10/18/2022                Interval Top: 7953 ft.    Interval Bottom: 7990 ft.

 Completed Information for Formation J SAND
1st Production Date:2/24/1984Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/26/2022Treatment End Date:N/A
Treatment Summary:JSand was perforated during the initial completion per Well Completion Report doc #83823.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 11
CALC_BBLS_H2O 11
CALC_BBLS_OIL 11
CALC_GOR 11818
CALC_MCF_GAS 130
GRAVITY_OIL 53.3
MCF_GAS 130
Perforation Data:
Interval Top:7953 ft.# Of Holes:148
Interval Bottom:7990 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  AB - 10/18/2022                Interval Top: 7832 ft.    Interval Bottom: 7852 ft.

 Completed Information for Formation CODELL
1st Production Date:5/13/1997Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/26/2022Treatment End Date:N/A
Treatment Summary:Codell was perforated during recompletion done in 1997 per Completed Interval Report doc #83831.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/10/1984
Treatment Summary:SEE SCANNED DOCUMENT #00083831
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 105
CALC_BBLS_H2O 105
Perforation Data:
Interval Top:7832 ft.# Of Holes:80
Interval Bottom:7852 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/18/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No