|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 8045 ft. Vertical TD: 8045 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | Wellbore Permit | | Permit #: | | Expiration Date: | 7/1/2012 | Proposed Depth/Form: | 8045 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 888 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 450, Top: 12 ft., Bottom: 888 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8045 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1690, Top: 6500 ft., Bottom: 8045 ft. |
| | |
Wellbore Completed | Completion Date: | 6/12/1983 | Spud Date: | 4/9/1983 | Spud Date Is: | ACTUAL | Measured TD: | 8045 ft. | Measured PB depth: | 7971 ft. | True Vertical TD: | 8045 ft. | True Vertical PB depth: | | Log Types: | SP-IES, FDC-GR CALIPER | Casing: | String Type: SURF, Hole Size: , Size: 9.625 in., Top: , Depth: 888 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: , Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: , Size: 4.5 in., Top: , Depth: 8045 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1430, Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4430 ft. | | N | N | SHANNON | 5125 ft. | | N | N | NIOBRARA | 7142 ft. | | N | N | CODELL | 7406 ft. | | N | N | BENTONITE | 7694 ft. | | N | N | J SAND | 7859 ft. | | N | N |
Formation JSND Formation Classification: OG Status: TA - 1/1/2017 Interval Top: 7859 ft. Interval Bottom: 7912 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/7/1984 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/27/2010 | Treatment Summary: | CIBP SET @ 7530-7730 | Formation Treatment | Treatment Date: | 6/12/1983 | Treatment Summary: | 187,572 GAL FLUID; 10,000# 20/40 SAND; 82,000# 20/40 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 20 | BBLS_OIL | 5 | CALC_BBLS_OIL | 66000 | GRAVITY_OIL | 56 | MCF_GAS | 330 |
| Perforation Data: | Interval Top: | 7859 ft. | # Of Holes: | 212 | Interval Bottom: | 7912 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OG Status: CM - 4/27/1999 Interval Top: 7410 ft. Interval Bottom: 7425 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/29/2004 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/11/2011 | Treatment Summary: | NB REC | Formation Treatment | Treatment Date: | 6/12/1983 | Treatment Summary: | 123,169 GAL FLUID; 251,980# 20/40 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 8 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 8 | CALC_GOR | 9250 | CALC_MCF_GAS | 74 | CASING_PRESS | 302 | GRAVITY_OIL | 51 | MCF_GAS | 74 | TUBING_PRESS | 178 |
| Perforation Data: | Interval Top: | 7410 ft. | # Of Holes: | 60 | Interval Bottom: | 7425 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 6/23/2005 Interval Top: 7410 ft. Interval Bottom: 7912 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | 0.000 in. | Formation Name: | J-CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/12/1983 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7813 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/23/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 9 | BBLS_OIL | 2 | CALC_BBLS_OIL | 2 | CALC_GOR | 19000 | CALC_MCF_GAS | 38 | CASING_PRESS | 490 | GRAVITY_OIL | 52 | MCF_GAS | 38 | TUBING_PRESS | 209 |
| Perforation Data: | Interval Top: | 7410 ft. | # Of Holes: | | Interval Bottom: | 7912 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OG Status: SI - 3/1/2022 Interval Top: 7194 ft. Interval Bottom: 7425 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/25/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/11/2010 | Treatment Summary: | NB REC |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7394 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/11/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1254 | CALC_GOR | 1267 | CALC_MCF_GAS | 6 | CASING_PRESS | 513 | GRAVITY_OIL | 50 | MCF_GAS | 6 | TUBING_PRESS | 141 |
| Perforation Data: | Interval Top: | 7194 ft. | # Of Holes: | 102 | Interval Bottom: | 7425 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 8/3/2011 Interval Top: 7194 ft. Interval Bottom: 7270 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/25/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/11/2010 | Treatment Summary: | Frac Niobrara B & C down 2-7/8" Tbg w/ Pkr ^ Nio w/ 166,328 gal Dynaflow 2 Hybrid w/ 250,780# 20/40 & 4,000# 20/40 SuperLC. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7194 ft. | # Of Holes: | 42 | Interval Bottom: | 7270 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 05/03/2024 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|