Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10971
Well Classification: GW Status: PR - 9/1/2025
Well Name/No:CHRISTINE #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:243180LocationID:319264
County:WELD #123Location:SWSE 15 4N65W 6
Field:WATTENBERG - #90750Elevation:4697 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1005FSL  1645 FELLat/Long: 40.307836 / -104.645587Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.308019 / -104.645526Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2025             Measured TD: 7680 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2025
Wellbore Permit
Permit #:20031789 Expiration Date:9/23/2004
Proposed Depth/Form:7680 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 80, Drill Unit: W/2SE4
Formation And Spacing:Code: GRRS , Formation: GRANEROS , Order: 318A , Unit Acreage: 80, Drill Unit: W/2SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 320 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:5/5/1984
Spud Date:12/29/1982Spud Date Is:ACTUAL
Measured TD:7680 ft.Measured PB depth:7626 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 453 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 453 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7685 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 7685 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4378 ft.
NIOBRARA6824 ft.
CODELL7056 ft.
J SAND7534 ft.

Formation JSND                     Formation Classification:  GW                     Status:  PR - 9/1/2025                  Interval Top: 7534 ft.

 Completed Information for Formation J SAND
1st Production Date:5/22/1984Choke Size:3,264.000 in.
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
No Perforation Data was found for formation JSND.

Formation GRNHN                   Formation Classification:  GW                   Status:  PR - 9/1/2025                  Interval Top: 7174 ft.    Interval Bottom: 7270 ft.

 Completed Information for Formation GREENHORN
1st Production Date:N/AChoke Size: 
Formation Name:GREENHORNCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/5/1984
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:2.375 in.Tubing Setting Depth:7033 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/8/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 57
BBLS_OIL 1
CALC_BBLS_H2O 57
CALC_BBLS_OIL 1
CALC_GOR 2000
CALC_MCF_GAS 2
CASING_PRESS 370
MCF_GAS 2
TUBING_PRESS 300
Perforation Data:
Interval Top:7174 ft.# Of Holes:240
Interval Bottom:7270 ft.Hole Size:0.35 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/2/2004                  Interval Top: 6848 ft.    Interval Bottom: 7591 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/5/1984
Treatment Summary:DRILL CIBP @ 7300'. PUSH CIBP TO 7604'. RIH W/PRODUCTION TBG. LAND 2-3/8" PRODUCTION TBG @ 7499'., SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7499 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/2/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 14
CALC_BBLS_H2O 18
CALC_BBLS_OIL 14
CALC_GOR 25286
CALC_MCF_GAS 354
CASING_PRESS 650
MCF_GAS 354
TUBING_PRESS 370
Perforation Data:
Interval Top:6848 ft.# Of Holes:266
Interval Bottom:7591 ft.Hole Size:0.35 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/12/2004                 Interval Top: 6848 ft.    Interval Bottom: 7064 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/5/1984
Treatment Summary:PERF'D THE NIOBRARA FROM 6860'-6890' AND 6950'-6980' W/2 SPF. SET CIBP@7040'. MIX AND PLACE 1 SX OF CMT ON CIBP. SET PKR@7002' POOH W/PKR. AND TBG. TEST REMAINING FRAC STRING. SET PKR@6711'. FRAC'D W/110,000 GAL FRAC FLUID AND 201,180#
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/12/2004Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 14
CALC_BBLS_H2O 18
CALC_BBLS_OIL 14
CALC_GOR 25286
CALC_MCF_GAS 354
MCF_GAS 157
TUBING_PRESS 230
Perforation Data:
Interval Top:6848 ft.# Of Holes:120
Interval Bottom:7064 ft.Hole Size:0.35 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 9/1/2025

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)6112
GOR100196
GOR DeterminationMCFE
Average BOE per Day3.052
Average MCFE per Day17.697

 Federal Financial Assurance  i 

 Tribal Well  i No