|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/1/2025 Measured TD: 8150 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/1/2025 | | Wellbore Permit | | | Permit #: | 19822073 | Expiration Date: | 12/22/1995 | | Proposed Depth/Form: | 8150 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: NW/4 |
| | |
| Wellbore Completed | | Completion Date: | 4/10/1985 | | Spud Date: | 12/17/1982 | Spud Date Is: | ACTUAL | | Measured TD: | 8150 ft. | Measured PB depth: | 8071 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL-SFL-GR, FDC-GR,CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 814 ft., Weight: 43 , Citings Type: ACTUAL | | Cement: | Sacks: 575, Top: 0 ft., Bottom: 814 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: , Top: 0 ft., Depth: 8150 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 850, Top: 3988 ft., Bottom: 8150 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4472 ft. | | | | | SHANNON | 4990 ft. | | | | | NIOBRARA | 7258 ft. | | | | | CODELL | 7532 ft. | | | | | J SAND | 7964 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 5/1/2025 Interval Top: 7958 ft. Interval Bottom: 8018 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/26/2007 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/10/1985 | | Treatment Summary: | CLEANED OUT SAND TO 8030'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 6 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 115666 | | CALC_MCF_GAS | 694 | | GRAVITY_OIL | 54 | | MCF_GAS | 694 |
| | Perforation Data: | | Interval Top: | 7958 ft. | # Of Holes: | 240 | | Interval Bottom: | 8018 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: AB - 5/1/2025 Interval Top: 7530 ft. Interval Bottom: 7552 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/10/1985 | | Treatment Summary: | NO ADDITIONAL TREATMENT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 167 | | BBLS_OIL | 9 | | CALC_BBLS_H2O | 167 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 6890 | | CALC_MCF_GAS | 62 | | CASING_PRESS | 490 | | GRAVITY_OIL | 47 | | MCF_GAS | 62 | | TUBING_PRESS | 445 |
| | Perforation Data: | | Interval Top: | 7530 ft. | # Of Holes: | 88 | | Interval Bottom: | 7552 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 12/7/2007 Interval Top: 7530 ft. Interval Bottom: 8018 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 11/26/2007 | Choke Size: | 0.375 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/10/1985 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7950 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/7/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 91 | | BTU_GAS | 1262 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 7500 | | CALC_MCF_GAS | 30 | | CASING_PRESS | 400 | | GRAVITY_OIL | 51 | | MCF_GAS | 812 | | TUBING_PRESS | 110 |
| | Perforation Data: | | Interval Top: | 7530 ft. | # Of Holes: | 328 | | Interval Bottom: | 8018 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/01/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|