|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/28/2023 Measured TD: 8318 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/28/2023 | | Wellbore Permit | | | Permit #: | 19821867 | Expiration Date: | 5/8/1995 | | Proposed Depth/Form: | 8330 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 9/14/1983 | | Spud Date: | 11/24/1982 | Spud Date Is: | ACTUAL | | Measured TD: | 8318 ft. | Measured PB depth: | 8243 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | SP-IES, FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 985 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 425, Top: 0 ft., Bottom: 985 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8318 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1065, Top: 4385 ft., Bottom: 8318 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4667 ft. | | N | N | | SHANNON | 5200 ft. | | N | N | | NIOBRARA | 7380 ft. | | N | N | | CODELL | 7720 ft. | | N | N | | BENTONITE | 7990 ft. | | N | N | | J SAND | 8160 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/28/2023 Interval Top: 8168 ft. Interval Bottom: 8198 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/2/1983 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/14/1983 | | Treatment Summary: | FRAC SPEARHEAD X 500 GAL 7.5% ACID, FRAC X 393 BC X 305 BW X 15000# MESH SN X 579000# 20/40 SN FLUSH X 202 B KCL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/14/1983 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 35 | | CALC_GOR | 18285 | | GRAVITY_OIL | 53.9 | | MCF_GAS | 640 |
| | Perforation Data: | | Interval Top: | 8168 ft. | # Of Holes: | | | Interval Bottom: | 8198 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: AB - 3/28/2023 Interval Top: 7720 ft. Interval Bottom: 7742 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/8/1995 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/14/1983 | | Treatment Summary: | DIVERTAFRAC: PUMPED 7? BBLS OF POLYMER GEL AND 215 BBLS OF POLYMER GEL WITH 4,500 LBS OF 20/40 SAND. FLUSHED WITH 120 BBLS OF POLYMER GEL. CODELL FRAC: PUMPED 429 BBLS OF POLYMER GEL AND 949 BBLS OF POLYMER GEL WITH 10 PPG AND 190,000 LBS OF 20/40 SAND. FLUSHED WITH 49 BBLS OF 2% KCL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/8/1995 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 77 | | CALC_GOR | 1324 | | CASING_PRESS | 750 | | MCF_GAS | 102 | | TUBING_PRESS | 125 |
| | Perforation Data: | | Interval Top: | 7720 ft. | # Of Holes: | 89 | | Interval Bottom: | 7742 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 2/12/1998 Interval Top: 7720 ft. Interval Bottom: 8198 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 4/19/1995 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8170 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/19/1995 | Test Method: | FLOWING | | Hours Tested: | 168 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 112 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 4750 | | CALC_MCF_GAS | 75 | | MCF_GAS | 525 |
| | Perforation Data: | | Interval Top: | 7720 ft. | # Of Holes: | | | Interval Bottom: | 8198 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/28/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|