Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10870
Well Classification: GW Status: PA - 2/5/2020
Well Name/No:FRANCIS DOUGHTY CLARK UNIT #B-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/5/2020
FacilityID:243079LocationID:319210
County:WELD #123Location:SESE 14 1N67W 6
Field:WATTENBERG - #90750Elevation:4947 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  990 FELLat/Long: 40.046378 / -104.852121Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.046360 / -104.852060Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/5/2020             Measured TD: 8130 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/5/2020
Wellbore PermitDRIFTED
Permit #:19821741 Expiration Date:3/3/1983
Proposed Depth/Form:8150 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:5/22/1983
Spud Date:10/27/1982Spud Date Is:ACTUAL
Measured TD:8130 ft.Measured PB depth:8070 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES FDC-GR CALIPER
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 861 ft., Weight: 43.5 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 861 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8130 ft., Weight: 15.5/17 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 4640 ft., Bottom: 8130 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: 5.5 in., Top: , Depth: 4440 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 4272 ft., Bottom: 4568 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: 5.5 in., Top: , Depth: 4440 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 4272 ft., Bottom: 4568 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4520 ft.NN
SHANNON5155 ft.NN
NIOBRARA7190 ft.NN
CODELL7522 ft.NN
BENTONITE7793 ft.NN
J SAND7946 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 2/5/2020                  Interval Top: 7964 ft.    Interval Bottom: 8022 ft.

 Completed Information for Formation J SAND
1st Production Date:5/3/1983Choke Size:0.000 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:5/22/1983
Treatment Summary:FRAC X 39,000# 100 MESH SN X 442,500# 20/40 SN X 433 BLC X 3771 BLW
Tubing Size:2.375 in.Tubing Setting Depth:7964 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/22/1983Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 18
CALC_GOR 45555
GRAVITY_OIL 62.3
MCF_GAS 820
Perforation Data:
Interval Top:7964 ft.# Of Holes:
Interval Bottom:8022 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  AB - 2/5/2020                  Interval Top: 7522 ft.    Interval Bottom: 7544 ft.

 Completed Information for Formation CODELL
1st Production Date:1/4/1996Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:5/22/1983
Treatment Summary:DIVERTAFRAC: PUMPED 71 BBLS OF POLYMER GEL AND 213 BBLS OF GEL WITH 4,500 LBS OF 20/40 SAND. FLUSH WITH 106 BBLS OF GEL. CODELL FRAC: PUMPED 477 BBLS OF GEL AND 786 BBLS OF GEL WITH 200,000 LBS OF 20/40 SAND. FLUSHED WITH 33 BBLS OF 2% KCL. MAX PSI: 6,700, MAX RATE: 17.2 BPM
Tubing Size:2.375 in.Tubing Setting Depth:7504 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/4/1996Test Method:FLOWING
Hours Tested:20.3Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 41
CALC_BBLS_H2O 16.55
CALC_BBLS_OIL 48.47
CALC_GOR 1854
CALC_MCF_GAS 88.66
CASING_PRESS 1578
MCF_GAS 75
TUBING_PRESS 1520
Perforation Data:
Interval Top:7522 ft.# Of Holes:88
Interval Bottom:7544 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 2/5/2020                  Interval Top: 7522 ft.    Interval Bottom: 8022 ft.

 Completed Information for Formation J-CODELL
1st Production Date:11/27/1996Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/27/1996Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 18
CALC_GOR 31222
MCF_GAS 562
Perforation Data:
Interval Top:7522 ft.# Of Holes:
Interval Bottom:8022 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/05/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No