|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/31/2018 Measured TD: 7690 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/31/2018 | Wellbore Permit | | Permit #: | 821313 | Expiration Date: | 10/18/1994 | Prop Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/14/1982 | Spud Date: | 8/20/1982 | Spud Date Is: | ACTUAL | Measured TD: | 7690 ft. | Measured PB depth: | 7647 ft. | True Vertical TD: | | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 513 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 375, Top: 0 ft., Bottom: 513 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7689 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 5904 ft., Bottom: 7689 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5242 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 40, Top: 5184 ft., Bottom: 5262 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4152 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 310, Top: 2220 ft., Bottom: 4180 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4032 ft. | | | | SHANNON | 4464 ft. | | | | NIOBRARA | 6750 ft. | | | | FORT HAYS | 7066 ft. | | | | CODELL | 7086 ft. | | | | MUDDY J | 7543 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/31/2018 Interval Top: 7554 ft. Interval Bottom: 7584 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/14/1983 | Choke Size: | 0.344 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/14/1982 | Treatment Summary: | 196,000 GAL APOLLO FLUID, 20,000# 100 MESH & 380,000# 20/40 SAND ATR 30 BPM, ATP 4000, MTR 30 BPM, MTP 4200, ISIP 3400 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/14/1982 | Test Method: | FLOWING | Hours Tested: | 7 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 13 | CALC_BBLS_H2O | 34 | CALC_BBLS_OIL | 45 | CALC_GOR | 73 | CALC_MCF_GAS | 3257 | CASING_PRESS | 600 | MCF_GAS | 950 | TUBING_PRESS | 340 |
| Perforation Data: | Interval Top: | 7554 ft. | # Of Holes: | 31 | Interval Bottom: | 7584 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 10/31/2018 Interval Top: 7088 ft. Interval Bottom: 7108 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/18/1994 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7088 ft. | # Of Holes: | 40 | Interval Bottom: | 7108 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/26/2001 Interval Top: 7088 ft. Interval Bottom: 7584 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 12/18/1994 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/14/1982 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7484 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation J-CDL. |
| Perforation Data: | Interval Top: | 7088 ft. | # Of Holes: | 71 | Interval Bottom: | 7584 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|