|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/1/2017 Measured TD: 8444 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/1/2017 | | Wellbore Permit | DRIFTED | | Permit #: | 19850534 | Expiration Date: | 4/25/1986 | | Proposed Depth/Form: | 8500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 5/6/1985 | Spud Date Is: | ACTUAL | | Measured TD: | 8444 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | DIL, CDL, NGT | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 717 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 394, Top: 0 ft., Bottom: 717 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8444 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 6270 ft., Bottom: 8444 ft., Determination Method: | | Additional Cement: | String Type: S.C. 1.1 , Top: 3730 ft., Depth: 4330 ft., Bottom: 4550 ft., Sacks: 161, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 5170 ft. | | | | | NIOBRARA | 7408 ft. | | | | | TIMPAS | 7845 ft. | | | | | CODELL | 7870 ft. | | | | | GREENHORN | 7935 ft. | | | | | J SAND | 8305 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 11/1/2017 Interval Top: 8308 ft. Interval Bottom: 8325 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/3/1985 | Choke Size: | 0.750 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/25/1994 | | Treatment Summary: | FRAC W/ 325,000# 20/40 M IN 99,500 GAL GEL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7726 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/3/1985 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | CALC_GOR | 75500 | | CASING_PRESS | 460 | | MCF_GAS | 755 | | TUBING_PRESS | 230 |
| | Perforation Data: | | Interval Top: | 8308 ft. | # Of Holes: | 68 | | Interval Bottom: | 8325 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/1/2017 Interval Top: 7448 ft. Interval Bottom: 8325 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/25/1994 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7726 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/19/1994 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 4 | | CALC_GOR | 135000 | | CASING_PRESS | 450 | | MCF_GAS | 540 | | TUBING_PRESS | 380 |
| | Perforation Data: | | Interval Top: | 7448 ft. | # Of Holes: | 1328 | | Interval Bottom: | 8325 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 11/1/2017 Interval Top: 7448 ft. Interval Bottom: 7883 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7726 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7448 ft. | # Of Holes: | 1260 | | Interval Bottom: | 7883 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 370 |
| Total Gas Produced (MCF) | 6703 |
| GOR | 18116 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.161 |
| Average MCFE per Day | 24.120 |
| Federal Financial Assurance | i | |
|
|