Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10719
Well Classification: GW Status: SI - 7/1/2024
Well Name/No:MEL BICKLING #11-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2024
FacilityID:242928LocationID:444853
County:WELD #123Location:NWNW 22 6N65W 6
Field:EATON - #19350Elevation:4713 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  660 FWLLat/Long: 40.477042 / -104.656537Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.477160 / -104.656660Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2024             Measured TD: 7658 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2024
Wellbore Permit
Permit #:20020831 Expiration Date:5/12/2003
Proposed Depth/Form:7658 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2NW
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 80, Drill Unit: W/2

Wellbore Completed
Completion Date:4/12/1983
Spud Date:6/21/1982Spud Date Is:ACTUAL
Measured TD:7658 ft.Measured PB depth:7250 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 285 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 285 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7656 ft., Weight: 15.50 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6500 ft., Bottom: 7656 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3621 ft.
SUSSEX4387 ft.
SHANNON4854 ft.
NIOBRARA6750 ft.
FORT HAYS7040 ft.
CARLILE7074 ft.
GREENHORN7273 ft.
BENTONITE7366 ft.
J SAND7542 ft.

Formation CODL                     Formation Classification:  GW                     Status:  AB - 1/22/2007                 Interval Top: 7079 ft.    Interval Bottom: 7089 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/1983
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7079 ft.# Of Holes:
Interval Bottom:7089 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  CM - 3/13/2013                 Interval Top: 6770 ft.    Interval Bottom: 7092 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/7/2007Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/1983
Treatment Summary:FRAC CODELL (7070"-7092') W/225,380# 20/40 SAND + 116,107 GALS PHOENIX 22 FRAC FLUID. FRAC NIOBRARA (6770'-6920') W/50,000# 20/40 SAND + 27,762 GALS PHOENIX 22 FRAC FLUID.
Tubing Size:2.875 in.Tubing Setting Depth:7058 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2002Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 9
BTU_GAS 1317
CALC_BBLS_H2O 2
CALC_BBLS_OIL 9
CALC_GOR 16000
CALC_MCF_GAS 146
CASING_PRESS 350
GRAVITY_OIL 48
MCF_GAS 146
TUBING_PRESS 150
Perforation Data:
Interval Top:6770 ft.# Of Holes:
Interval Bottom:7092 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  SI - 7/1/2024                  Interval Top: 6768 ft.    Interval Bottom: 6920 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/7/2007Choke Size:0.250 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/26/2007
Treatment Summary:238,180# 30/50 OTTAWA SAND + 12,000# 12/20 SAND FRAC W/ 4073 BBLS CROSS LINKED & SILBVERSTIM FLUID.
Tubing Size:2.875 in.Tubing Setting Depth:6757 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2007Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 7
BTU_GAS 1331
CALC_BBLS_H2O 8
CALC_BBLS_OIL 7
CALC_GOR 24000
CALC_MCF_GAS 168
CASING_PRESS 145
GRAVITY_OIL 49
MCF_GAS 168
TUBING_PRESS 10
Perforation Data:
Interval Top:6768 ft.# Of Holes:192
Interval Bottom:6920 ft.Hole Size:0.42 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY04/16/2026
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
10/30/2025
Defined Inactive (SI)YLast Production
06/30/2024
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No