|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/12/2023 Measured TD: 7307 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/12/2023 | | Wellbore Permit | | | Permit #: | 820327 | Expiration Date: | 6/26/1982 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE |
| | |
| Wellbore Completed | | Completion Date: | 7/14/1982 | | Measured TD: | 7307 ft. | Measured PB depth: | 7259 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 13.375 in., Size: 9.625 in., Top: 0 ft., Depth: 436 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 436 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7300 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 6140 ft., Bottom: 7300 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4255 ft. | | | | | HYGIENE | 5245 ft. | | | | | NIOBRARA | 6592 ft. | | | | | FORT HAYS | 7108 ft. | | | | | CODELL | 7156 ft. | | | |
Formation CODL Formation Classification: GW Status: AB - 1/2/2023 Interval Top: 7162 ft. Interval Bottom: 7172 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/19/1982 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7162 ft. | # Of Holes: | 33 | | Interval Bottom: | 7172 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: GW Status: AB - 4/12/2023 Interval Top: 6860 ft. Interval Bottom: 7050 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/19/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/1/2008 | | Treatment Summary: | The Niobrara completion was done by Merit prior to the aquisition of this well by PDC. Limited information on the job is available.
Fluid Used:
237 bbls FDP pre-pad
1429 bbls of FR pad
2431 bbls Silverstim fluids
Proppant Used:
238440 lbs Ottawa 30/50 sand
12000 lbs SB Excel 12/20 sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6860 ft. | # Of Holes: | 402 | | Interval Bottom: | 7050 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/12/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 12/08/2022 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|