|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2022 Measured TD: 8540 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2022 | | Wellbore Permit | | | Permit #: | 19811741 | Expiration Date: | 10/1/1982 | | Proposed Depth/Form: | 8540 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/9/1981 | | Spud Date: | 10/10/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 8540 ft. | Measured PB depth: | 8528 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | IEL/SP; CDL/GR; CBL, VBL/GR; CBL, CCL, GR; RADIO | | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 930 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8536 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 2ND, Hole Size: , Size: 2.875 in., Top: , Depth: 8248 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 65, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7568 ft. | | | | | CODELL | 8006 ft. | | | | | J SAND | 8444 ft. | | | |
Formation JSND Formation Classification: OW Status: PR - 3/1/2022 Interval Top: 8448 ft. Interval Bottom: 8459 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/2/1981 | Choke Size: | 0.750 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/9/1981 | | Treatment Summary: | ACIDIZED W/ 1,000 GAL 7.5% HCL, FRAC W/ 320,000# 20/40 M & H2O. FRAC W/ 144,450 GAL W/ 40# & 30# APOLLO GEL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/8/1981 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | CALC_GOR | 334000 | | CASING_PRESS | 100 | | GRAVITY_OIL | 0.59 | | MCF_GAS | 1336 |
| | Perforation Data: | | Interval Top: | 8448 ft. | # Of Holes: | 15 | | Interval Bottom: | 8459 ft. | Hole Size: | 0.64 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 3/1/2020 Interval Top: 7590 ft. Interval Bottom: 8459 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 11/23/1993 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/26/1993 | Test Method: | FLOWING | | Hours Tested: | 2.5 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | CALC_BBLS_OIL | 76.8 | | CALC_GOR | 7250 | | CALC_MCF_GAS | 557 | | MCF_GAS | 58 |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 30 | | Interval Bottom: | 8459 ft. | Hole Size: | 0.64 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 3/1/2022 Interval Top: 7590 ft. Interval Bottom: 8017 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/9/1981 | | Treatment Summary: | ACIDIZED W/ 1,000 GAL 7.5% HCL, FRAC W/ 91,651 GAL H2O W/ MY-T-GEL 1,350 HT & 416,500# 20/40 M |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 15 | | Interval Bottom: | 8017 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 200 |
| Total Gas Produced (MCF) | 752 |
| GOR | 3760 |
| GOR Determination | BOE |
| Average BOE per Day | 0.915 |
| Average MCFE per Day | 5.290 |
| Federal Financial Assurance | i | |
|
|