Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10405
Well Classification: GW Status: SI - 12/1/2021
Well Name/No:LUHMAN #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2021
FacilityID:242614LocationID:318969
County:WELD #123Location:SWSE 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4921 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  1650 FELLat/Long: 40.162617 / -104.891903Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.162723 / -104.891708Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2021             Measured TD: 8056 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2021
Wellbore Permit
Permit #:19811643 Expiration Date:8/28/1997
Proposed Depth/Form:8056 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: W/2 SE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:N/A
Spud Date:9/21/1981Spud Date Is:ACTUAL
Measured TD:8056 ft.Measured PB depth:8012 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Log Types:IES FDC/GR CBL-VDL-GR-CCL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 426 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 426 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8054 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 7050 ft., Bottom: 8054 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 6360 ft., Depth: 7020 ft., Bottom: 7020 ft., Sacks: 200, Method: 1 INCH
Additional Cement:String Type: 1ST , Top: 4970 ft., Depth: 5081 ft., Bottom: 5080 ft., Sacks: 300, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
SUSSEX4478 ft.
SHANNON4898 ft.
NIOBRARA7195 ft.
J SAND7908 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 12/1/2021                 Interval Top: 7908 ft.    Interval Bottom: 7978 ft.

 Completed Information for Formation J SAND
1st Production Date:12/7/1981Choke Size:0.375 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:9/19/1996
Treatment Summary:500 GAL 7-1/2% NE ACID 20000 GAL PREPAD 30000 PAD 25000# 100 MESH 474000# 20/40 SD IN 168000 GAL VERSAGEL W/60T CO2
Tubing Size:2.375 in.Tubing Setting Depth:7445 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/9/1981Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 49
BBLS_OIL 5
CALC_BBLS_H2O 49
CALC_BBLS_OIL 5
CALC_GOR 128000
CALC_MCF_GAS 639
CASING_PRESS 260
GRAVITY_OIL 51
MCF_GAS 639
Perforation Data:
Interval Top:7908 ft.# Of Holes:15
Interval Bottom:7978 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/18/2010                Interval Top: 7472 ft.    Interval Bottom: 7488 ft.

 Completed Information for Formation CODELL
1st Production Date:9/19/1996Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/19/1996
Treatment Summary:FRAC'D THE CODELL (7472-7488) W/ 110,500 GALS MEDALLION FRAC 3500 W/ 10,000# 100 MESH SAND AND 392,000# 20/40 SAND, 9-12-96. SET CBP @ 7580', 9-07-04. REFRAC W/ 124,572 GAL CROSS-LINKED GEL WITH 300,528# 20/40 SAND, 9-12-04
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 25
CALC_BBLS_H2O 2
CALC_BBLS_OIL 25
CALC_GOR 1800
CALC_MCF_GAS 45
CASING_PRESS 440
MCF_GAS 45
TUBING_PRESS 200
Perforation Data:
Interval Top:7472 ft.# Of Holes:64
Interval Bottom:7488 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/28/2004                 Interval Top: 7472 ft.    Interval Bottom: 7956 ft.

 Completed Information for Formation J-CODELL
1st Production Date:8/16/1998Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/19/1996
Treatment Summary:DRILLED UP PLUG @ 7580' TO COMMINGLE THE J SAND AND THE CODELL, 9-16-04
Tubing Size:2.375 in.Tubing Setting Depth:7890 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/28/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 1
CALC_BBLS_H2O 0
CALC_BBLS_OIL 1
CALC_GOR 40000
CALC_MCF_GAS 40
CASING_PRESS 360
MCF_GAS 40
TUBING_PRESS 325
Perforation Data:
Interval Top:7472 ft.# Of Holes:79
Interval Bottom:7956 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 12/11/2009                Interval Top: 7256 ft.    Interval Bottom: 7956 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/30/2009
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP@ 7350' AND 7600' TO COMMINGLE THE JSND-NBRR-CDL. 11-30-09
Tubing Size:2.375 in.Tubing Setting Depth:7880 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2009Test Method:FLOWING
Hours Tested:12Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 12
BTU_GAS 1293
CALC_BBLS_H2O 3
CALC_BBLS_OIL 12
CALC_GOR 63333
CALC_MCF_GAS 76
CASING_PRESS 460
GRAVITY_OIL 52
MCF_GAS 76
TUBING_PRESS 174
Perforation Data:
Interval Top:7256 ft.# Of Holes:132
Interval Bottom:7956 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 12/1/2021                 Interval Top: 7256 ft.    Interval Bottom: 7488 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/11/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/23/2009
Treatment Summary:NBRR-CDL RECOMPLETION: SET CFP @ 7600'. 11-12-09. PUMPED THE CODELL WITH 250,620# 20/40 SAND IN 80,556 GALS VISTAR XLF. SAND PUMPED FROM 1# TO 5#. 11-18-09. TOTAL GELLED FLUID - 118,104 GALS. TOTAL FRAC FLUID - 118,104 GALS. 11-18-09. SET CFP @7350'. 11-19-09. PUMPED THE NIOBRARA WITH 250,900# 20/40 SAND. DAND PUMPED FROM 1# TO 5#. 11-23-09. TOTAL GELLED FLUID 96,516 GALS. TOTAL FRAC FLUID - 139, 566 GALS. 11-23-09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7256 ft.# Of Holes:120
Interval Bottom:7488 ft.Hole Size:
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
11/30/2021
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No