|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/24/2021 Measured TD: 7721 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/24/2021 | | Wellbore Permit | | | Permit #: | 19811624 | Expiration Date: | 10/25/1993 | | Proposed Depth/Form: | 7721 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 10/21/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 7721 ft. | Measured PB depth: | 7690 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL, CDL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 222 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 222 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7713 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 7170 ft., Bottom: 7713 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7155 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6000 ft., Bottom: 7155 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5060 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 267, Top: 4222 ft., Bottom: 5052 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.3, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 2411 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 0 ft., Bottom: 2398 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4222 ft., Depth: 5060 ft., Bottom: 5052 ft., Sacks: 267, Method: 1 INCH | | Additional Cement: | String Type: 1ST , Top: 649 ft., Depth: 2411 ft., Bottom: 2398 ft., Sacks: 200, Method: 1 INCH | | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: 649 ft., Bottom: 649 ft., Sacks: 275, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6844 ft. | | N | N | | FORT HAYS | 7106 ft. | | N | N | | CARLILE | 7128 ft. | | N | N | | GREENHORN | 7194 ft. | | N | N | | J SAND | 7580 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/24/2021 Interval Top: 7592 ft. Interval Bottom: 7640 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/28/1981 | Choke Size: | 0.500 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/4/1993 | | Treatment Summary: | ACIDIZE W/1000 GALS 15% HCI BREAKDOWN. FRAC W/218,820 GAL APOLLO GEL 25,000# 100 MESH & 499,000# 20/40 MESH SAND & 40 TONS CO2. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7685 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/28/1981 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | CALC_MCF_GAS | 600 | | CASING_PRESS | 550 | | MCF_GAS | 600 | | TUBING_PRESS | 210 |
| | Perforation Data: | | Interval Top: | 7592 ft. | # Of Holes: | 84 | | Interval Bottom: | 7640 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 5/24/2021 Interval Top: 7130 ft. Interval Bottom: 7146 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/22/1992 | Choke Size: | 0.063 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/4/1993 | | Treatment Summary: | 31,000 GALS MY-T-GEL 1400 HT + 47,350 GALS MY-T-GEL 1350 HT + 4050 GAL GW + 221,440# 20/40 SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7156 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/12/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 25 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 12600 | | CALC_MCF_GAS | 315 | | CASING_PRESS | 480 | | GRAVITY_OIL | 53 | | MCF_GAS | 315 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 64 | | Interval Bottom: | 7146 ft. | Hole Size: | 0.4 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 7/12/1996 Interval Top: 7130 ft. Interval Bottom: 7640 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 10/14/1993 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/4/1993 | | Treatment Summary: | COMMINGLED |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7606 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/22/1993 | Test Method: | PLUNGER 500 | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 5 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 55000 | | CALC_MCF_GAS | 275 | | CASING_PRESS | 380 | | GRAVITY_OIL | 53 | | MCF_GAS | 275 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | | | Interval Bottom: | 7640 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/24/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|