Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10362
Well Classification: OW Status: PA - 4/12/2021
Well Name/No:OTTESEN #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/12/2021
FacilityID:242571LocationID:318948
County:WELD #123Location:NWSW 3 1N65W 6
Field:WATTENBERG - #90750Elevation:4960 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1570FSL  990 FWLLat/Long: 40.077559 / -104.655905Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.077640 / -104.655810Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/12/2021             Measured TD: 7992 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/12/2021
Wellbore Permit
Permit #:20052298 Expiration Date:8/14/2006
Proposed Depth/Form:7870 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SW
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 218 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 160, Top: 0 ft., Bottom: 218 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7870 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: , Bottom: 7870 ft.

Wellbore Completed
Completion Date:12/18/1998
Spud Date:8/15/1981Spud Date Is:ACTUAL
Measured TD:7992 ft.Measured PB depth:7992 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR-CCL, FDC; ISF
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 218 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 160 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7870 ft., Weight: 10.5/11.6, Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6640 ft., Bottom: 7870 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 850 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 550 ft., Bottom: 850 ft., Determination Method: CALC
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1250 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: , Bottom: 1250 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS667 ft.NN
PIERRE930 ft.NN
SUSSEX4506 ft.NN
NIOBRARA6933 ft.NN
FORT HAYS7244 ft.NN
CARLILE7266 ft.NN
GREENHORN7324 ft.NN
D SAND7653 ft.NN
J SAND7710 ft.NN
SKULL CREEK7751 ft.NN
DAKOTA7909 ft.7992 ft.NN

Formation DKTA                     Formation Classification:  OW                     Status:  AB - 4/12/2021                 Interval Top: 7909 ft.    Interval Bottom: 7992 ft.

 Completed Information for Formation DAKOTA
1st Production Date:11/1/1998Choke Size: 
Formation Name:DAKOTACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/18/1998
Treatment Summary:FRAC OPEN HOLE DAKOTA WITH 36,750 GAL HYBOR 35, 40,880# 20/40 SAND AND 4000# ACFRAC. SAND PLUG, SEE J SAND ABOVE.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1100
CALC_BBLS_H2O 8
CALC_BBLS_OIL 0
CALC_MCF_GAS 57
CASING_PRESS 520
TUBING_PRESS 175
Perforation Data:
Interval Top:7909 ft.# Of Holes:50
Interval Bottom:7992 ft.Hole Size:0.36 in.

Formation DK-J                     Formation Classification:  GW                     Status:  CM - 12/18/1998                Interval Top: 7712 ft.    Interval Bottom: 7992 ft.

 Completed Information for Formation DAKOTA-JSND
1st Production Date:12/18/1998Choke Size:0.500 in.
Formation Name:DAKOTA-JSNDCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:12/18/1998
Treatment Summary:FRAC OPEN HOLE DAKOTA WITH 36,750 GALS HYBOR 35, 40,880# 20/40 SAND, & 4000# ACFRAC BLACK IS PROPANT DOWN TUBING WITH PACKER SET BELOW J PERFORATIONS.
Tubing Size:2.375 in.Tubing Setting Depth:7687 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/1998Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8.5
BTU_GAS 1100
CALC_BBLS_H2O 8.5
CALC_MCF_GAS 57
CASING_PRESS 520
MCF_GAS 57
TUBING_PRESS 175
Perforation Data:
Interval Top:7712 ft.# Of Holes:
Interval Bottom:7992 ft.Hole Size:

Formation JSND                     Formation Classification:  OW                     Status:  AB - 4/12/2021                 Interval Top: 7712 ft.    Interval Bottom: 7746 ft.

 Completed Information for Formation J SAND
1st Production Date:2/5/1982Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/3/1982
Treatment Summary:FRAC WITH 105,000 GAL VERSA GEL FLUID, 15,000# 100 MESH SAND, 300,000# 20/40 SAND AND 38 TONS CARBON DIOXIDE. 11/08/05 RU AND PUMP 15 BBLS 2% KCL WATER WITH 2100# 20/40 FRAC SAND TO SPOT SAND PLUG ACROSS THE J SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 4
CALC_BBLS_H2O 0
CALC_BBLS_OIL 4
CALC_GOR 130000
CALC_MCF_GAS 520
CASING_PRESS 150
MCF_GAS 520
Perforation Data:
Interval Top:7712 ft.# Of Holes:50
Interval Bottom:7746 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/1/2007                 Interval Top: 7270 ft.    Interval Bottom: 7280 ft.

 Completed Information for Formation CODELL
1st Production Date:12/2/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/21/2005
Treatment Summary:FRAC'D WITH 161,946 GAL SLICK WATER GEL WITH 116,260# 20/40 FRAC SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7270 ft.# Of Holes:20
Interval Bottom:7280 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 11/1/2007                 Interval Top: 7035 ft.    Interval Bottom: 7746 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:9/28/2007Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/18/1998
Treatment Summary:DRILL OUT SAND PLUG TO BELOW EXISTING J SAND PERFORATIONS, COMMINGLE J SAND WITH NIOBRARA-CODELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JNBCD.
Perforation Data:
Interval Top:7035 ft.# Of Holes:50
Interval Bottom:7746 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/12/2021                 Interval Top: 7035 ft.    Interval Bottom: 7280 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/5/2005Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/21/2005
Treatment Summary:FRAC'D WITH 161,946 GAL SLICK WATER WITH 116,260# FRAC SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 14
CALC_GOR 3929
CALC_MCF_GAS 55
Perforation Data:
Interval Top:7035 ft.# Of Holes:50
Interval Bottom:7280 ft.Hole Size:0.36 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/1/2007                 Interval Top: 7035 ft.    Interval Bottom: 7138 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/2/2005Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/21/2005
Treatment Summary:FRAC'D WITH 161,946 GAL SLICK WATER GEL WITH 116,230# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7035 ft.# Of Holes:10
Interval Bottom:7138 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/12/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No