|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2026 Measured TD: 7890 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2026 | | Wellbore Permit | | | Permit #: | 19810536 | Expiration Date: | 10/2/1992 | | Proposed Depth/Form: | 7900 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 8/25/1981 | | Spud Date: | 5/7/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 7890 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMP.DENSITY, DIL, CCL-CBL-GR | | Log Types: | I-SFL, FDC-GR, CB-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 471 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7890 ft., Weight: 17;15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 770, Top: 6150 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4254 ft. | | N | N | | NIOBRARA | 6997 ft. | | N | N | | CODELL | 7304 ft. | | N | N | | J SAND | 7764 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 5/1/2017 Interval Top: 7766 ft. Interval Bottom: 7812 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/25/1981 | Choke Size: | 0.265 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/25/1981 | | Treatment Summary: | 36,600 GALS YF540; 61,300 GALS YF535 & 300,000# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/25/1981 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 300 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 300 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 106000 | | CALC_MCF_GAS | 530 | | CASING_PRESS | 1400 | | MCF_GAS | 530 |
| | Perforation Data: | | Interval Top: | 7766 ft. | # Of Holes: | 58 | | Interval Bottom: | 7812 ft. | Hole Size: | 0.32 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 1/4/2006 Interval Top: 7304 ft. Interval Bottom: 7812 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | J-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/25/1981 | | Treatment Summary: | COMMINGLE CODELL & J-SAND |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7728 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/4/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 10400 | | CALC_MCF_GAS | 52 | | CASING_PRESS | 500 | | MCF_GAS | 52 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | 7304 ft. | # Of Holes: | 121 | | Interval Bottom: | 7812 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: SI - 1/1/2026 Interval Top: 7081 ft. Interval Bottom: 7322 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/4/1996 | Choke Size: | 0.500 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/25/1981 | | Treatment Summary: | 7081-7322' 36,600 GALS YF540; 61,300 GALS YF535 & 300,000# 20/40 SAND, 1996. CODL REFRAC:126,210 GAL VISTAR 26/24 GEL & 245,580# 20/40 OTTAWA SAND, 2002. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7285 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/4/2002 | Test Method: | FLOWING | | Hours Tested: | 4 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 25 | | CALC_BBLS_H2O | 48 | | CALC_BBLS_OIL | 150 | | CALC_GOR | 5760 | | CALC_MCF_GAS | 864 | | CASING_PRESS | 450 | | MCF_GAS | 144 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 7081 ft. | # Of Holes: | 16 | | Interval Bottom: | 7322 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 11 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.003 |
| Average MCFE per Day | 0.030 |
| Federal Financial Assurance | i | |
|
|