|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2024 Measured TD: 7890 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2024 | Wellbore Permit | | Permit #: | 19810536 | Expiration Date: | 10/2/1992 | Proposed Depth/Form: | 7900 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: W2 |
| | |
Wellbore Completed | Completion Date: | 8/25/1981 | Spud Date: | 5/7/1981 | Spud Date Is: | ACTUAL | Measured TD: | 7890 ft. | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP.DENSITY, DIL, CCL-CBL-GR | Log Types: | I-SFL, FDC-GR, CB-GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 471 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 360, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7890 ft., Weight: 17;15.5 , Citings Type: ACTUAL | Cement: | Sacks: 770, Top: 6150 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4254 ft. | | N | N | NIOBRARA | 6997 ft. | | N | N | CODELL | 7304 ft. | | N | N | J SAND | 7764 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 5/1/2017 Interval Top: 7766 ft. Interval Bottom: 7812 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/25/1981 | Choke Size: | 0.265 in. | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/25/1981 | Treatment Summary: | 36,600 GALS YF540; 61,300 GALS YF535 & 300,000# 20/40 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/25/1981 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 300 | BBLS_OIL | 5 | CALC_BBLS_H2O | 300 | CALC_BBLS_OIL | 5 | CALC_GOR | 106000 | CALC_MCF_GAS | 530 | CASING_PRESS | 1400 | MCF_GAS | 530 |
| Perforation Data: | Interval Top: | 7766 ft. | # Of Holes: | 58 | Interval Bottom: | 7812 ft. | Hole Size: | 0.32 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 1/4/2006 Interval Top: 7304 ft. Interval Bottom: 7812 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | 0.313 in. | Formation Name: | J-CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/25/1981 | Treatment Summary: | COMMINGLE CODELL & J-SAND |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7728 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/4/2006 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 5 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 5 | CALC_GOR | 10400 | CALC_MCF_GAS | 52 | CASING_PRESS | 500 | MCF_GAS | 52 | TUBING_PRESS | 450 |
| Perforation Data: | Interval Top: | 7304 ft. | # Of Holes: | 121 | Interval Bottom: | 7812 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: PR - 9/1/2024 Interval Top: 7081 ft. Interval Bottom: 7322 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/4/1996 | Choke Size: | 0.500 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/25/1981 | Treatment Summary: | 7081-7322' 36,600 GALS YF540; 61,300 GALS YF535 & 300,000# 20/40 SAND, 1996. CODL REFRAC:126,210 GAL VISTAR 26/24 GEL & 245,580# 20/40 OTTAWA SAND, 2002. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7285 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/4/2002 | Test Method: | FLOWING | Hours Tested: | 4 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 8 | BBLS_OIL | 25 | CALC_BBLS_H2O | 48 | CALC_BBLS_OIL | 150 | CALC_GOR | 5760 | CALC_MCF_GAS | 864 | CASING_PRESS | 450 | MCF_GAS | 144 | TUBING_PRESS | 250 |
| Perforation Data: | Interval Top: | 7081 ft. | # Of Holes: | 16 | Interval Bottom: | 7322 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 66 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.027 |
Average MCFE per Day | 0.180 |
Federal Financial Assurance | i | |
|
|