|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2025 Measured TD: 5216 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2025 | | Wellbore Permit | | | Permit #: | 19810474 | Expiration Date: | 7/27/1981 | | Proposed Depth/Form: | 5250 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 40, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/23/1981 | | Spud Date: | 4/23/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 5216 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | INDUC. ELEC & COMPENSATED DEN. LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 615 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 615 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5216 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 4294 ft., Bottom: 5216 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4620 ft. | | | | | BENTONITE | 4785 ft. | | | | | SHANNON | 5080 ft. | | | |
Formation SX-SN Formation Classification: OW Status: PR - 3/1/2025 Interval Top: 4620 ft. Interval Bottom: 5105 ft.| Completed Information for Formation SUSSEX-SHANNON | | 1st Production Date: | 5/24/1981 | Choke Size: | | | Formation Name: | SUSSEX-SHANNON | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/23/1981 | | Treatment Summary: | 300 GALS ACID, 2,507 BBLS WATER, K-1 FRAC 847 BBLS. 1,540 BBLS OIL 120 BBLS FLUSH 296,000# SAND AIR - 25 BBLS PER MINUTE (BOTH ZONES SAME) |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/5/1981 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 200 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 200 | | CALC_GOR | 90 | | CALC_MCF_GAS | 180 | | GRAVITY_OIL | 46 | | MCF_GAS | 180 |
| | Perforation Data: | | Interval Top: | 4620 ft. | # Of Holes: | | | Interval Bottom: | 5105 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 162 |
| Total Gas Produced (MCF) | 148 |
| GOR | 913 |
| GOR Determination | BOE |
| Average BOE per Day | 0.504 |
| Average MCFE per Day | 2.946 |
| Federal Financial Assurance | i | |
|
|