|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 3/28/2024 Measured TD: 7653 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 3/28/2024 | | Wellbore Permit | | | Permit #: | 20040169 | Expiration Date: | 2/24/2005 | | Proposed Depth/Form: | 7676 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 454 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 454 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7676 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 6604 ft., Bottom: 7676 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/9/1995 | | Spud Date: | 3/11/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 7653 ft. | Measured PB depth: | 7630 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 454 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 454 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7675 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6610 ft., Bottom: 7676 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4770 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 3650 ft., Bottom: 4770 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4345 ft. | | | | | NIOBRARA | 6790 ft. | | | | | J SAND | 7538 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 3/28/2024 Interval Top: 7538 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/11/1981 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/7/1981 | | Treatment Summary: | FRAC W/10,000 GAL PREPAD 40,000 GAL PAD 25,000# 100 MESH SAND. 351,500# 20/40 SAND, 139,500 GAL GEL 20 TON CO2 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 5/30/2012 Interval Top: 7062 ft. Interval Bottom: 7074 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/10/1994 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/10/2012 | | Treatment Summary: | CIBP set @ 7130 on 2/9/2012; drilled out 4/30/12.
Re-frac 7062-7074 with 116,968 gals frac fluid and 250,260 # sand (2/10/12)
| | Formation Treatment | | Treatment Date: | 8/7/1981 | | Treatment Summary: | 301,000#20/40 SD IN 63,264 GAL X-LINKED PUR-GEL FLD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 35 | | CALC_GOR | 11729 | | MCF_GAS | 400 |
| | Perforation Data: | | Interval Top: | 7062 ft. | # Of Holes: | 45 | | Interval Bottom: | 7074 ft. | Hole Size: | 3 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 10/11/2012 Interval Top: 7062 ft. Interval Bottom: 7586 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/7/1981 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6814 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/15/1999 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 6 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 33667 | | CALC_MCF_GAS | 202 | | CASING_PRESS | 450 | | MCF_GAS | 202 | | TUBING_PRESS | 420 |
| | Perforation Data: | | Interval Top: | 7062 ft. | # Of Holes: | 39 | | Interval Bottom: | 7586 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/28/2024 Interval Top: 6810 ft. Interval Bottom: 7074 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/6/2004 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/7/1981 | | Treatment Summary: | PUMPED NB-CD W/127,000 GAL FRAC FLUID AND 69,000#SAND. 2/6/04 FRAC NB-CD W/301,000# 20/40 SAND AND 63,264 GAL X-LINK PUR GEL FLUID 7-81. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6810 ft. | # Of Holes: | 144 | | Interval Bottom: | 7074 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OG Status: CM - 5/30/2012 Interval Top: 6794 ft. Interval Bottom: 7586 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/7/1981 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7420 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/6/2012 | Test Method: | Flow | | Hours Tested: | 6 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 7 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 17143 | | CALC_MCF_GAS | 480 | | CASING_PRESS | 529 | | GRAVITY_OIL | 65 | | MCF_GAS | 120 | | TUBING_PRESS | 295 |
| | Perforation Data: | | Interval Top: | 6794 ft. | # Of Holes: | 247 | | Interval Bottom: | 7586 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OG Status: CM - 10/11/2012 Interval Top: 6794 ft. Interval Bottom: 6990 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/6/2004 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/10/2012 | | Treatment Summary: | Add perfs to Niobrara 6794-6810, 4 spf, 64 holes.
Frac w/135,978 gal frac fluid and 254,600 # sand (2/10/12)
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6794 ft. | # Of Holes: | 184 | | Interval Bottom: | 6990 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/28/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|