|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2025 Measured TD: 7977 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2025 | | Wellbore Permit | | | Permit #: | 19801590 | Expiration Date: | 11/6/1981 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407-66 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 11/10/1980 | Spud Date Is: | ACTUAL | | Measured TD: | 7977 ft. | Measured PB depth: | 7908 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | INDUCTION ELECTRIC LOG, COMPENSATED DENSITY | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 225 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 225 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7970 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7010 ft., Bottom: 7970 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 5720 ft., Depth: 6925 ft., Bottom: 6925 ft., Sacks: 355, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4050 ft., Depth: 4830 ft., Bottom: 4780 ft., Sacks: 100, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 562 ft., Depth: 750 ft., Bottom: 750 ft., Sacks: 150, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: 562 ft., Bottom: 562 ft., Sacks: 215, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4525 ft. | | N | N | | BENTONITE | 7672 ft. | | N | N | | J SAND | 7838 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 7844 ft. Interval Bottom: 7886 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/8/1981 | Choke Size: | 0.750 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/8/1981 | | Treatment Summary: | 832,000# 20/40 SAND, 500 GAL BDA IN 200,000 GAL FRAC FLUID |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7800 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/12/1981 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | CASING_PRESS | 540 | | MCF_GAS | 890 | | TUBING_PRESS | 270 |
| | Perforation Data: | | Interval Top: | 7844 ft. | # Of Holes: | 30 | | Interval Bottom: | 7886 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 4/22/1993 Interval Top: 7400 ft. Interval Bottom: 7415 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/15/1993 | Choke Size: | 0.125 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/8/1981 | | Treatment Summary: | 286,000# 20/40 SAND, 12,000# 20/40 RCS IN 91,770 GALS GEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 50 | | BBLS_OIL | 41 | | CALC_BBLS_OIL | 7634 | | MCF_GAS | 313 | | TUBING_PRESS | 375 |
| | Perforation Data: | | Interval Top: | 7400 ft. | # Of Holes: | 60 | | Interval Bottom: | 7415 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/29/2009 Interval Top: 7172 ft. Interval Bottom: 7886 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/8/1981 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE RELEASE RBP @ 7240' AND 7486' TO COMMINGLE THE JSND-NBRR-CDL. 03-19-09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7836 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/29/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 18 | | BTU_GAS | 1229 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 8778 | | CALC_MCF_GAS | 158 | | CASING_PRESS | 585 | | GRAVITY_OIL | 50 | | MCF_GAS | 158 | | TUBING_PRESS | 169 |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 130 | | Interval Bottom: | 7886 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 7172 ft. Interval Bottom: 7418 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2009 | | Treatment Summary: | NBRR-CODL REFRAC & RECOMPLETION. (SEE OPERATORS COMMENTS, NEXT PAGE FOR DETAILS) |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/1/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 8 | | BTU_GAS | 1229 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 4875 | | CALC_MCF_GAS | 39 | | CASING_PRESS | 130 | | GRAVITY_OIL | 56 | | MCF_GAS | 39 |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 100 | | Interval Bottom: | 7418 ft. | Hole Size: | 0.42 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/1/2009| Completed Information for Formation J-CODELL | | 1st Production Date: | 6/24/1993 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7820 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/14/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 30 | | CALC_GOR | 1933 | | CASING_PRESS | 450 | | MCF_GAS | 58 | | TUBING_PRESS | 140 |
| | No Perforation Data was found for formation J-CDL. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 3 |
| Total Gas Produced (MCF) | 80 |
| GOR | 26666 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.053 |
| Average MCFE per Day | 0.271 |
| Federal Financial Assurance | i | |
|
|