Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10076
Well Classification: GW Status: TA - 11/25/2020
Well Name/No:MASON GAS UNIT #3-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date11/25/2020
FacilityID:242285LocationID:318839
County:WELD #123Location:NESE 8 2N66W 6
Field:WATTENBERG - #90750Elevation:4882 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1470FSL  990 FELLat/Long: 40.149287 / -104.795130Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.149421 / -104.795306Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 11/25/2020             Measured TD: 7962 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 11/25/2020
Wellbore Permit
Permit #:19801322 Expiration Date:9/24/1981
Proposed Depth/Form:7962 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:7/16/1993
Spud Date:10/30/1980Spud Date Is:ACTUAL
Measured TD:7962 ft.Measured PB depth:7917 ft.
True Vertical TD:True Vertical PB depth:
Log Types:IEL, DCL, GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7962 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4526 ft.NN
BENTONITE7770 ft.NN
J SAND7820 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  TA - 11/25/2020                Interval Top: 7830 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J SAND
1st Production Date:4/13/1981Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:SEE SCANNED DOCUMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 24
CASING_PRESS 310
MCF_GAS 1150
Perforation Data:
Interval Top:7830 ft.# Of Holes:30
Interval Bottom:7860 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/8/2005                 Interval Top: 7374 ft.    Interval Bottom: 7389 ft.

 Completed Information for Formation CODELL
1st Production Date:4/26/1993Choke Size:0.125 in.
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:SEE SCANNED DOCUMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/1993Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 61
BBLS_OIL 52
CALC_GOR 3019
MCF_GAS 157
TUBING_PRESS 775
Perforation Data:
Interval Top:7374 ft.# Of Holes:60
Interval Bottom:7389 ft.Hole Size:

Formation JDCNB                   Formation Classification:  GW                   Status:  CM - 9/21/2009                 Interval Top: 7130 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J-D-CODELL-NIOBRARA
1st Production Date:N/AChoke Size:0.406 in.
Formation Name:J-D-CODELL-NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:JSND-NBRR-CDL-COMMINGLE. RELEASED RBP@ 7200' TO COMMINGLE THE JSND-NBRR-CDL. 9/15/09.
Tubing Size:2.375 in.Tubing Setting Depth:7811 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/21/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 28
BTU_GAS 1305
CALC_BBLS_H2O 6
CALC_BBLS_OIL 28
CALC_GOR 5500
CALC_MCF_GAS 154
CASING_PRESS 629
GRAVITY_OIL 53
MCF_GAS 154
TUBING_PRESS 368
Perforation Data:
Interval Top:7130 ft.# Of Holes:150
Interval Bottom:7860 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/23/2004                Interval Top: 7130 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:JSND-NBRR-CDL COMMINGLE; DRILLED OUT CBP TO COMMINGLE THE JSND-NBRR-CDL. 10/19/04.
Tubing Size:2.375 in.Tubing Setting Depth:7825 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2004Test Method:FLOWING
Hours Tested:22Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 8
CALC_BBLS_H2O 15
CALC_BBLS_OIL 8
CALC_GOR 6875
CALC_MCF_GAS 55
CASING_PRESS 1000
MCF_GAS 55
TUBING_PRESS 460
Perforation Data:
Interval Top:7130 ft.# Of Holes:150
Interval Bottom:7860 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 11/25/2020                Interval Top: 7130 ft.    Interval Bottom: 7389 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/21/2004Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/17/2009
Treatment Summary:NBRR-CDL RECOMPLETION SET CFP @ 7510'. 07-14-09. DUMP SAND/CEMENT ON PLUG. SET RBP @ 7430'. 08-06-09. RE-FRAC'D THE CODELL WITH 106,554 GAL 26/20# VISTAR CROSS LINKED GEL HYBRID CONTAINING 250,940# SAND. 08-09-08 . RELEASED RBP @ 7430'. 08/13/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 28
BTU_GAS 1305
CALC_BBLS_H2O 6
CALC_BBLS_OIL 28
CALC_GOR 5500
CALC_MCF_GAS 154
CASING_PRESS 629
GRAVITY_OIL 53
MCF_GAS 154
TUBING_PRESS 368
Perforation Data:
Interval Top:7130 ft.# Of Holes:120
Interval Bottom:7389 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/21/2009

 Completed Information for Formation J-CODELL
1st Production Date:7/16/1993Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:SEE SCANNED DOCUMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/22/1993Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 10
CALC_GOR 50000
CASING_PRESS 250
MCF_GAS 500
TUBING_PRESS 150
No Perforation Data was found for formation J-CDL.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
05/31/2020
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No