|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 11/25/2020 Measured TD: 7962 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 11/25/2020 | | Wellbore Permit | | | Permit #: | 19801322 | Expiration Date: | 9/24/1981 | | Proposed Depth/Form: | 7962 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 7/16/1993 | | Spud Date: | 10/30/1980 | Spud Date Is: | ACTUAL | | Measured TD: | 7962 ft. | Measured PB depth: | 7917 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IEL, DCL, GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7962 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4526 ft. | | N | N | | BENTONITE | 7770 ft. | | N | N | | J SAND | 7820 ft. | | N | N |
Formation JSND Formation Classification: GW Status: TA - 11/25/2020 Interval Top: 7830 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/13/1981 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/16/1993 | | Treatment Summary: | SEE SCANNED DOCUMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | CASING_PRESS | 310 | | MCF_GAS | 1150 |
| | Perforation Data: | | Interval Top: | 7830 ft. | # Of Holes: | 30 | | Interval Bottom: | 7860 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 11/8/2005 Interval Top: 7374 ft. Interval Bottom: 7389 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/26/1993 | Choke Size: | 0.125 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/16/1993 | | Treatment Summary: | SEE SCANNED DOCUMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/30/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 61 | | BBLS_OIL | 52 | | CALC_GOR | 3019 | | MCF_GAS | 157 | | TUBING_PRESS | 775 |
| | Perforation Data: | | Interval Top: | 7374 ft. | # Of Holes: | 60 | | Interval Bottom: | 7389 ft. | Hole Size: | |
|
Formation JDCNB Formation Classification: GW Status: CM - 9/21/2009 Interval Top: 7130 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J-D-CODELL-NIOBRARA | | 1st Production Date: | N/A | Choke Size: | 0.406 in. | | Formation Name: | J-D-CODELL-NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/16/1993 | | Treatment Summary: | JSND-NBRR-CDL-COMMINGLE. RELEASED RBP@ 7200' TO COMMINGLE THE JSND-NBRR-CDL. 9/15/09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7811 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/21/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 28 | | BTU_GAS | 1305 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 5500 | | CALC_MCF_GAS | 154 | | CASING_PRESS | 629 | | GRAVITY_OIL | 53 | | MCF_GAS | 154 | | TUBING_PRESS | 368 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 150 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/23/2004 Interval Top: 7130 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/16/1993 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE; DRILLED OUT CBP TO COMMINGLE THE JSND-NBRR-CDL. 10/19/04. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7825 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/23/2004 | Test Method: | FLOWING | | Hours Tested: | 22 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 8 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 6875 | | CALC_MCF_GAS | 55 | | CASING_PRESS | 1000 | | MCF_GAS | 55 | | TUBING_PRESS | 460 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 150 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 11/25/2020 Interval Top: 7130 ft. Interval Bottom: 7389 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/21/2004 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/17/2009 | | Treatment Summary: | NBRR-CDL RECOMPLETION SET CFP @ 7510'. 07-14-09. DUMP SAND/CEMENT ON PLUG. SET RBP @ 7430'. 08-06-09. RE-FRAC'D THE CODELL WITH 106,554 GAL 26/20# VISTAR CROSS LINKED GEL HYBRID CONTAINING 250,940# SAND. 08-09-08 . RELEASED RBP @ 7430'. 08/13/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 28 | | BTU_GAS | 1305 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 5500 | | CALC_MCF_GAS | 154 | | CASING_PRESS | 629 | | GRAVITY_OIL | 53 | | MCF_GAS | 154 | | TUBING_PRESS | 368 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 120 | | Interval Bottom: | 7389 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 9/21/2009| Completed Information for Formation J-CODELL | | 1st Production Date: | 7/16/1993 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/16/1993 | | Treatment Summary: | SEE SCANNED DOCUMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/22/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 10 | | CALC_GOR | 50000 | | CASING_PRESS | 250 | | MCF_GAS | 500 | | TUBING_PRESS | 150 |
| | No Perforation Data was found for formation J-CDL. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 05/31/2020 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|