Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-10076
Well Classification: GW Status: TA - 11/25/2020
Well Name/No:MASON GAS UNIT #3-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date11/25/2020
FacilityID:242285LocationID:318839
County:WELD #123Location:NESE 8 2N66W 6
Field:WATTENBERG - #90750Elevation:4882 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1470FSL  990 FELLat/Long: 40.149287 / -104.795130Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.149421 / -104.795306Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 11/25/2020             Measured TD: 7962 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 11/25/2020
Wellbore Permit
Permit #:19801322 Expiration Date:9/24/1981
Proposed Depth/Form:7962 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:7/16/1993
Spud Date:10/30/1980Spud Date Is:ACTUAL
Measured TD:7962 ft.Measured PB depth:7917 ft.
True Vertical TD:True Vertical PB depth:
Log Types:IEL, DCL, GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7962 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4526 ft.NN
BENTONITE7770 ft.NN
J SAND7820 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  TA - 11/25/2020                Interval Top: 7830 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J SAND
1st Production Date:4/13/1981Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:SEE SCANNED DOCUMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 24
CASING_PRESS 310
MCF_GAS 1150
Perforation Data:
Interval Top:7830 ft.# Of Holes:30
Interval Bottom:7860 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/8/2005                 Interval Top: 7374 ft.    Interval Bottom: 7389 ft.

 Completed Information for Formation CODELL
1st Production Date:4/26/1993Choke Size:0.125 in.
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:SEE SCANNED DOCUMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/1993Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 61
BBLS_OIL 52
CALC_GOR 3019
MCF_GAS 157
TUBING_PRESS 775
Perforation Data:
Interval Top:7374 ft.# Of Holes:60
Interval Bottom:7389 ft.Hole Size:

Formation JDCNB                   Formation Classification:  GW                   Status:  CM - 9/21/2009                 Interval Top: 7130 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J-D-CODELL-NIOBRARA
1st Production Date:N/AChoke Size:0.406 in.
Formation Name:J-D-CODELL-NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:JSND-NBRR-CDL-COMMINGLE. RELEASED RBP@ 7200' TO COMMINGLE THE JSND-NBRR-CDL. 9/15/09.
Tubing Size:2.375 in.Tubing Setting Depth:7811 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/21/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 28
BTU_GAS 1305
CALC_BBLS_H2O 6
CALC_BBLS_OIL 28
CALC_GOR 5500
CALC_MCF_GAS 154
CASING_PRESS 629
GRAVITY_OIL 53
MCF_GAS 154
TUBING_PRESS 368
Perforation Data:
Interval Top:7130 ft.# Of Holes:150
Interval Bottom:7860 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/23/2004                Interval Top: 7130 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:JSND-NBRR-CDL COMMINGLE; DRILLED OUT CBP TO COMMINGLE THE JSND-NBRR-CDL. 10/19/04.
Tubing Size:2.375 in.Tubing Setting Depth:7825 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2004Test Method:FLOWING
Hours Tested:22Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 8
CALC_BBLS_H2O 15
CALC_BBLS_OIL 8
CALC_GOR 6875
CALC_MCF_GAS 55
CASING_PRESS 1000
MCF_GAS 55
TUBING_PRESS 460
Perforation Data:
Interval Top:7130 ft.# Of Holes:150
Interval Bottom:7860 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 11/25/2020                Interval Top: 7130 ft.    Interval Bottom: 7389 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/21/2004Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/17/2009
Treatment Summary:NBRR-CDL RECOMPLETION SET CFP @ 7510'. 07-14-09. DUMP SAND/CEMENT ON PLUG. SET RBP @ 7430'. 08-06-09. RE-FRAC'D THE CODELL WITH 106,554 GAL 26/20# VISTAR CROSS LINKED GEL HYBRID CONTAINING 250,940# SAND. 08-09-08 . RELEASED RBP @ 7430'. 08/13/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 28
BTU_GAS 1305
CALC_BBLS_H2O 6
CALC_BBLS_OIL 28
CALC_GOR 5500
CALC_MCF_GAS 154
CASING_PRESS 629
GRAVITY_OIL 53
MCF_GAS 154
TUBING_PRESS 368
Perforation Data:
Interval Top:7130 ft.# Of Holes:120
Interval Bottom:7389 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/21/2009

 Completed Information for Formation J-CODELL
1st Production Date:7/16/1993Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:7/16/1993
Treatment Summary:SEE SCANNED DOCUMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/22/1993Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 10
CALC_GOR 50000
CASING_PRESS 250
MCF_GAS 500
TUBING_PRESS 150
No Perforation Data was found for formation J-CDL.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
05/31/2020
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No