Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-09845
Well Classification: GW Status: PA - 9/29/2023
Well Name/No:ALBERT SACK UNIT C #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/29/2023
FacilityID:242054LocationID:318736
County:WELD #123Location:SESW 31 1N67W 6
Field:WATTENBERG - #90750Elevation:5053 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  1650 FWLLat/Long: 40.003138 / -104.936713Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.003154 / -104.936668Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/29/2023             Measured TD: 8450 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/29/2023
Wellbore Permit
Permit #:19980447 Expiration Date:5/10/1999
Proposed Depth/Form:8650 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499,232 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/21/1980
Spud Date:12/7/1979Spud Date Is:ACTUAL
Measured TD:8450 ft.Measured PB depth:8391 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES, FDC-GR CALIPER
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 234 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 234 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8450 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6884 ft., Bottom: 8450 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8450 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4186 ft., Bottom: 5150 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8450 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 370 ft., Bottom: 917 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE728 ft.
SUSSEX4700 ft.
SHANNON5380 ft.
NIOBRARA7415 ft.
CODELL7858 ft.
BENTONITE8126 ft.
J SAND8290 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 9/29/2023                 Interval Top: 8290 ft.    Interval Bottom: 8350 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/21/1980
Treatment Summary:POLARIS FRAC 6,258 GAL OF COND X 114,912 GAL OF WATER - 420,000# 20/40 SN
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 12
CALC_GOR 40000
GRAVITY_OIL 61
MCF_GAS 480
Perforation Data:
Interval Top:8290 ft.# Of Holes:240
Interval Bottom:8350 ft.Hole Size:0.38 in.

Formation JNFHC                   Formation Classification:  GW                   Status:  CM - 2/12/1998                 Interval Top: 7452 ft.    Interval Bottom: 8350 ft.

 Completed Information for Formation J-NIOBRARA-FT HAYS-CODELL
1st Production Date:11/4/1996Choke Size: 
Formation Name:J-NIOBRARA-FT HAYS-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:8298 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/4/1996Test Method:FLOWING
Hours Tested:168Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 35
BBLS_OIL 77
CALC_BBLS_H2O 5
CALC_BBLS_OIL 11
CALC_GOR 4636
CALC_MCF_GAS 51
MCF_GAS 357
Perforation Data:
Interval Top:7452 ft.# Of Holes:
Interval Bottom:8350 ft.Hole Size:0.38 in.

Formation NBFHC                   Formation Classification:  GW                   Status:  AB - 9/29/2023                 Interval Top: 7452 ft.    Interval Bottom: 7873 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/21/1980
Treatment Summary:FLUSH WITH 45 BBLS OF BRINE, PUMPED 833 BBLS OF POLYMER GEL AND 1881 BBLS OF X-LINK GELLED BRINE WATER WITH 400,000 LBS OF 20/40 SAND. FLUSHED WITH 46 BBLS OF 2% KCL. MAX PSI: 5,780, MAX RATE: 25.5 BPM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 27
CALC_BBLS_H2O 107
CALC_BBLS_OIL 76
CALC_GOR 3404
CALC_MCF_GAS 259
MCF_GAS 194
TUBING_PRESS 360
Perforation Data:
Interval Top:7452 ft.# Of Holes:236
Interval Bottom:7873 ft.Hole Size:0.3 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/29/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No