|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/24/2016 Measured TD: 7900 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/24/2016 | | Wellbore Permit | | | Permit #: | 19981076 | Expiration Date: | 11/26/1999 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 318A , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 1/31/1979 | Spud Date Is: | ACTUAL | | Measured TD: | 7900 ft. | Measured PB depth: | 7855 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | SP-IES, FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 213 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7900 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6820 ft., Bottom: 7900 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6760 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 145, Top: 6440 ft., Bottom: 6765 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 755 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 760 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 710 ft. | | | | | NIOBRARA | 6990 ft. | | | | | BENTONITE | 7556 ft. | | | | | J SAND | 7731 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/24/2016 Interval Top: 7732 ft. Interval Bottom: 7774 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/16/1980 | Choke Size: | 1.000 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/16/1980 | | Treatment Summary: | SEE SCANNED DOCUMENTS |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7704 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/16/1980 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 2 | | CALC_GOR | 350000 | | GRAVITY_OIL | 55.8 | | MCF_GAS | 700 | | TUBING_PRESS | 425 |
| | Perforation Data: | | Interval Top: | 7732 ft. | # Of Holes: | 52 | | Interval Bottom: | 7774 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: AB - 2/24/2016 Interval Top: 7297 ft. Interval Bottom: 7311 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/30/2002 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/16/1980 | | Treatment Summary: | SEE SCANNED DOCUMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/15/2001 | Test Method: | PLUNGER 500 | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 92 | | BBLS_OIL | 14 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 14 | | CALC_MCF_GAS | 92 | | MCF_GAS | 92 |
| | Perforation Data: | | Interval Top: | 7297 ft. | # Of Holes: | 68 | | Interval Bottom: | 7311 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/24/2016 Interval Top: 7297 ft. Interval Bottom: 7774 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 2/28/2001 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/16/1980 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/15/2001 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 14 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 14 | | CALC_GOR | 6570 | | CALC_MCF_GAS | 92 | | MCF_GAS | 92 |
| | Perforation Data: | | Interval Top: | 7297 ft. | # Of Holes: | 120 | | Interval Bottom: | 7774 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/24/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|